My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Refunding of escrow
Orono
>
Property Files
>
Street Address
>
F
>
Fox Street
>
2801 Fox Street - 04-117-23-34-0004
>
Correspondence
>
Refunding of escrow
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:12:53 PM
Creation date
12/19/2016 11:30:14 AM
Metadata
Fields
Template:
x Address Old
House Number
2801
Street Name
Fox
Street Type
Street
Address
2801 Fox St
Document Type
Correspondence
PIN
0411723340004
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• O�rono, MN Code of Ordinances Page 10 of 13 <br /> (f) Site erosion contro% <br /> (1) Channelized runoff from adjacent areas passing through the site shall be diverted <br /> around disturbed areas, if practical. Diverted runoff shall be conveyed in a manner that <br /> will not erode the conveyance at receiving channels. Ali temporary or permanent <br /> drainage channels must be stabilized within 24 hours of being connected to a water of <br /> the state. Sediment control is required along channel edges to reduce sediment reaching <br /> the channel. <br /> (2) All activities on the site shall be conducted in a logical sequence to minimize the area of <br /> bare soil exposed at any one time. <br /> (3) All disturbed ground left inactive for 14 or more days must have temporary or <br /> permanent stabilization year round. <br /> (4) For sites with more than ten acres disturbed at one time, or if a channel originates in the <br /> disturbed area, one or more temporary or permanent sedimentation basins shall be <br /> constructed. Each sedimentation basin shall have a surface area of at least one percent <br /> of the area draining to the basin and at least three feet of depth and constructed in <br /> accordance with accepted design specifications. Sediment shall be removed to maintain a <br /> depth of three feet. The basin discharge rate shall also be sufficiently low as to not cause <br /> erosion along the discharge channel or the receiving water. <br /> (5) Perimeter sediment control measures shall be placed along all down gradient perimeters <br /> of the site. If a channel or area of concentrated runoff passes through the site, perimeter <br /> sediment control measures shall be placed along the channel edges to reduce sediment <br /> reaching the channel. All down gradient perimeter sediment control measures must <br /> include a maintenance and inspection schedule. <br /> (6) Any soil or dirt storage piles containing more than ten cubic yards of material should not <br /> be located within 25 feet from a roadway or drainage channel. If remaining for more <br /> than 14 days, they shall be stabilized by mulching vegetative cover, tarps or other means <br /> and enclosed with down gradient perimeter sediment controls. Piles which will be in <br /> existence for less than 14 days shall be enclosed with perimeter sediment controls. <br /> (7) Pipe outlets must have energy dissipation installed within 24 hours of connection to <br /> waters of the state. <br /> (g) lnspections and maintenance. The owner shall be responsible for conducting inspections and <br /> maintenance of all erosion and sediment control BMPs on site. <br /> (1) Inspections, maintenance, and rainfall on site must be documented and readily available <br /> for review. Inspections are required as followed: <br /> about:blank 11/21/2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.