Laserfiche WebLink
� Oxono, MN Code of Ordinances Page 8 of 13 <br /> Process. For any subdivision, the stormwater pollution prevention plan shall be submitted <br /> with the preliminary plat application. For all other applications, the stormwater pollution <br /> prevention plan meeting the requirements of section 79-7 and minimum BMP requirements <br /> of section 79-9 must be reviewed by the city engineer or designated representative who may <br /> approve, approve with conditions, or deny the stormwater pollution prevention plan prior to <br /> any land disturbing activity on the site. <br /> (b) Duration. Approval of a stormwater pollution prevention plan submitted under the <br /> provisions of this article shall expire one single year after the date of approval unless <br /> construction has commenced in accordance with the plan. However, if prior to the expiration <br /> of the approval, the owner makes a written request to the city for an extension of time to <br /> commence construction setting forth the reason for the requested extension, the city <br /> engineer may grant one extension of not more than one single year. Receipt of any request <br /> for an extension shall be acknowledged by the city within 15 days. The city shall make a <br /> decision on the extension within 30 days of receipt. Any plan may be revised in the same <br /> manner as originally approved. <br /> (c) Conditions. A stormwater pollution prevention plan may be approved subject to compliance <br /> with conditions reasonable and necessary to ensure that the requirements contained in <br /> these regulations are met. Such conditions may, among other matters, limit the size, kind or <br /> character of the proposed development, require replacement of vegetation, establish <br /> required monitoring procedures, stage the work over time, or require alteration of the site <br /> design to ensure buffering, and require the conveyance to the city or other public entity of <br /> certain lands or interests therein. <br /> (d) Financialsecurity. The adequacy, conditions and acceptability of any financial security shall <br /> be determined by the city. <br /> (Ord. No. 55 3rd series, § 1, 4-13-2009; Ord. No. 69 3rd series, § 1, 4-12-2010) <br /> Sec. 79-9. - Minimum SWPPP Best Management Practices (BMPs). <br /> (a) [Plan standards required.J No stormwater pollution prevention plan that fails to meet the <br /> standards contained in this section shall be approved by the city council or designated <br /> representative. <br /> (b) Site dewatering. Water pumped from the site shall be treated by temporary sedimentation <br /> basins, grit chambers, sand filters, upflow chambers, hydrocyclones, swirl concentrators or <br /> other appropriate controls as appropriate. All water from dewatering must be discharged in a <br /> about:blank 11/21/2016 <br />