My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-22-2016 Council Packet
Orono
>
City Council
>
1950-2024
>
2010-2019
>
2016
>
08-22-2016 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2016 3:59:52 PM
Creation date
12/16/2016 3:53:42 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE <br />ORONO CITY COUNCIL MEETING <br />Monday, August 8, 2016 <br />7:00 o’clock p.m. <br />_____________________________________________________________________________________ <br /> <br />Page 3 of 17 <br /> <br />PUBLIC WORKS/CITY ENGINEER REPORT <br /> <br />*5. MnDOT PARTNERSHIP CONTRACT – RESOLUTION NO. 6657 <br /> <br />Levang moved, Walsh seconded, to approve the Master Partnership Contract between the City of <br />Orono and MnDOT and to adopt RESOLUTION NO. 6657, a Resolution to Enter into a Master <br />Partnership Contract with the Minnesota Department of Transportation. VOTE: Ayes 5, Nays 0. <br /> <br />6. FOX STREET FEASIBILITY REPORT <br /> <br />Public Works Director/City Engineer Edwards noted in December of 2015, the City Council approved the <br />preparation of a feasibility study for Fox Street in order to evaluate improvements to the street. <br /> <br />David Martini, Consulting City Engineer, stated the report was broken into three sections: <br /> <br />The first section is entitled Section A and encompasses Fox Street from Old Crystal Bay Road to Willow <br />Drive. <br /> <br />Martini displayed picture of the roads included in Section A. Martini noted the aggregate in this section <br />ranges from 9.5 to 4.5 inches currently. Option A involves the reconstruction of the roadway in the <br />current footprint, creating an even width of 24 feet, construction of a pavement section that includes <br />geotextile fabric, and ten inches of aggregate base and five inches of bituminous pavement. The cost for <br />this option is $735,413. There would also be some culvert repair and ditch cleaning as well as <br />replacement of the bollards with guardrail. <br /> <br />Section B encompasses Fox Street from Willow Drive to Brown Road and is an MSA route. Option B <br />involves the reconstruction of the roadway in the current footprint, creating an even width of 24 feet, <br />construction of a pavement section that includes geotextile fabric, ten inches of aggregate base and five <br />inches of bituminous pavement. Martini indicated this project is similar to the Baldur Park Road project. <br />Also included in the project is replacement of some culverts, ditch cleaning, and installing a new <br />guardrail. The cost for Option B is $643,545. <br /> <br />Martini noted Section B is a designated MSA road and is therefore eligible for state funding. Based on <br />current projects, sufficient funding will be available in the MSA account in 2017 for Section B. Sections <br />A and C require funding from the Pavement Management Fund if either of these projects are to be <br />completed in 2017. <br /> <br />Martini stated not replacing the aggregate base in Sections A or B would result in the road not meeting its <br />anticipated life expectancy. <br /> <br />Section C encompasses Fox Street from Brown Road to Orono Orchard Road. Option C includes milling <br />of the road and a three inch overlay with some segment patching at a cost of $418,271. This section is in <br />the best shape out of all three sections. <br /> <br />Martini indicated the total cost for all three sections is $1.8 million and that he is looking for Council <br />approval to accept the feasibility report. <br /> <br />Council Member Printup asked if less is more in relation to the swampy areas.
The URL can be used to link to this page
Your browser does not support the video tag.