My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-08-2016 Council Packet
Orono
>
City Council
>
2016
>
08-08-2016 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2016 3:22:34 PM
Creation date
12/16/2016 3:14:35 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
396
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
R-9 <br /> <br />3.2.2 Fox Street - Section B Project Costs <br />FOX STREET (B) - MSA RECONSTRUCT: UNIT QUANTITY UNIT PRICE <br />TOTAL <br />AMOUNT <br />MOBILIZATION LS 1 $25,000.00 $25,000.00 <br />TRAFFIC CONTROL LS 1 $10,000.00 $10,000.00 <br />REMOVE BOLLARD POST EACH 27 $50.00 $1,350.00 <br />REMOVE BITUMINOUS PAVEMENT SQ YD 6400 $4.00 $25,600.00 <br />COMMON EXCAVATION CU YD 1900 $20.00 $38,000.00 <br />AGGREGATE BASE, CLASS 5 (CV) CU YD 2110 $30.00 $63,300.00 <br />SELECT GRANULAR BORROW CU YD 250 $20.00 $5,000.00 <br />BITUMINOUS BASE COURSE TON 1280 $65.00 $83,200.00 <br />2" BITUMINOUS WEARING COURSE SQ YD 6700 $8.00 $53,600.00 <br />SUBGRADE PREPARATION SQ YD 6900 $2.00 $13,800.00 <br />SUBGRADE EXCAVATION CU YD 1150 $20.00 $23,000.00 <br />LIGHTWEIGHT FILL CU YD 925 $35.00 $32,375.00 <br />GEOTEXTILE FABRIC TYPE V SQ YD 6900 $1.50 $10,350.00 <br />AGGREGATE SHOULDERING TON 85 $35.00 $2,975.00 <br />BITUMINOUS DRIVEWAY SQ YD 40 $27.50 $1,100.00 <br />AGGREGATE DRIVEWAY, CLASS 5 TON 15 $40.00 $600.00 <br />DITCH CLEANING & SHAPING LS 1 $20,000.00 $20,000.00 <br />TRAFFIC BARRIER DESIGN B8307 LIN FT 100 $45.00 $4,500.00 <br />END TREATMENT - TANGENT TERMINAL EACH 6 $3,500.00 $21,000.00 <br />TURF ESTABLISHMENT SQ YD 3200 $5.00 $16,000.00 <br />TOPSOIL DRESSING (LV) CU YD 700 $30.00 $21,000.00 <br />4" SOLID LINE WHITE-EPOXY LIN FT 4950 $0.50 $2,475.00 <br />4" DOUBLE SOLID LINE YELLOW-EPOXY LIN FT 2475 $1.00 $2,475.00 <br /> <br /> <br />SUBTOTAL CONSTRUCTION COST $476,700.00 <br /> <br />35% CONTINGENCY & SOFT COSTS $166,845.00 <br /> <br />TOTAL PROJECT COSTS (SECTION B) $643,545.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.