Laserfiche WebLink
PRELIMINARY ESTIMATE <br />2016 Old Crystal Bay Road Turn Lane Addition- High School <br />City of Orono, Minnesota <br />BMI Project No. <br />Item Estimated Unit Total <br />No.Bid Item Unit Quantity Price Amount <br />1 MOBILIZATION LUMP SUM 1 $2,300.00 $2,300.00 <br />2 TRAFFIC CONTROL LUMP SUM 1 $2,300.00 $2,300.00 <br />3 REMOVE BITUMINOUS PAVEMENT SQ YD 100 $10.00 $1,000.00 <br />4 REMOVE CONCRETE CURB AND GUTTER LIN FT 5 $10.00 $50.00 <br />5 REMOVE STORM PIPE LIN FT 8 $15.00 $120.00 <br />6 DITCH GRADING LUMP SUM 1 $3,000.00 $3,000.00 <br />7 COMMON EXCAVATION (P) (EV)CU YD 180 $22.50 $4,050.00 <br />8 COMMON BORROW (CV)CU YD 220 $15.00 $3,300.00 <br />9 SUBGRADE EXCAVATION (EV)CU YD 20 $22.50 $450.00 <br />10 SUBGRADE PREPARATION (P)SQ YD 510 $1.50 $765.00 <br />11 AGGREGATE BASE (CV) CLASS 5, 100% CRUSHED CU YD 189 $40.00 $7,560.00 <br />12 TYPE SP 12.5 NON WEARING COURSE MIX (3,B)TON 65 $100.00 $6,500.00 <br />13 TYPE SP 9.5 WEARING COURSE MIX (4,B) 1.5" THICK SQ YD 430 $10.00 $4,300.00 <br />14 SHOULDER AGGREGATE CLASS 2 CU YD 10 $22.50 $225.00 <br />15 18" RC STORM SEWER PIPE CL V LIN FT 8 $125.00 $1,000.00 <br />16 18" RC STORM SEWER APRON W/ TRASH GUARD EACH 1 $2,000.00 $2,000.00 <br />17 CONCRETE CURB & GUTTER DESIGN B612 LIN FT 10 $25.00 $250.00 <br />18 PAVEMENT MESSAGE (ARROW) EPOXY EACH 2 $150.00 $300.00 <br />19 4" SOLID LINE WHITE - EPOXY LIN FT 480 $1.00 $480.00 <br />20 24" SOLID LINE WHITE - EPOXY LIN FT 15 $12.50 $187.50 <br />21 EROSION CONTROL LUMP SUM 1 $2,000.00 $2,000.00 <br />22 TOPSOIL BORROW (LV)CU YD 130 $35.00 $4,550.00 <br />23 HYDROMULCH W/ 25-151 SEED MIX SQ YD 580 $5.00 $2,900.00 <br />TOTAL ESTIMATED CONSTRUCTION COST:$49,587.50 <br />CONTINGENCY (10%):$4,958.75 <br />TOTAL ESTIMATED CONSTRUCTION COST AND CONTINGENCY:$54,546.25