Laserfiche WebLink
REQUEST FOR COUNCIL ACTION <br /> <br /> <br />DATE: July 11, 2016 <br /> ITEM NO: 7b <br />_____________________________________________________________________________________________ <br />Department Approval: Administrator Reviewed: Agenda Section: <br />Name Adam Edwards JML Public Works Director/ <br />Title Public Works Director/City Engineer City Engineer’s Report <br />____________________________________________________________________________________ <br />Item Description: Lurton Off Leash Park Revised Design <br />________________________________________________________________________________________________________ <br /> <br />List of Exhibits <br />A. Revised Project Design <br />B. Revised Cost Estimate <br /> <br />1. Purpose. The purpose of this item is to gain council approval for the revised design of the of <br />Lurton Off Leash Park. <br /> <br />2. Background. Since its reestablishment the Orono Park Commission has been looking for <br />ways to establish an off leash dog park within the Orono park system. Last fall the Lurton <br />family approached the City with the idea of exploring possibilities to improve the public’s usage <br />of Lurton Park by transitioning the park into an off leash park. City Staff and the Parks <br />Commission developed a plan to transition the park. At the March 7th Park Commission meeting <br />the Commission endorsed the Off Leash Dog Park Plan. Council approved the design/master <br />plan for the off leash park at their April 25th meeting. Since then the process of gaining the <br />required variances for the fence has resulted in changes to the layout of the park. At their July <br />5th meeting the Park Commission voted unanimously to recommend approval of the revised <br />design. Further due to the reduced fencing requirement and cost the Park Commission <br />recommends that the well, shade structures and additional picnic table be re-included in the <br />project. <br /> <br />3. Design Changes. A copy of the revised design is Exhibit A. Changes include the movement <br />of the perimeter fence 150 ft. south of the northern park boundary, the move of the fence back <br />out of wetland setback along the western wetland and the majority of the eastern wetland as well <br />as the switch of the small dog off leash area from the prairie to the eastern extremity of the park. <br /> <br />4. Project Cost. The estimated cost of the project was $129,198. The estimated cost for the <br />revised layout and the re-inclusion of well, table and shade structures is $121,360 (See Exhibit <br />B) <br /> <br />5. COUNCIL ACTION REQUESTED: <br />Consider a motion to approve the revised design for reconfiguring Lurton Park to an off leash <br />dog park. <br /> <br />