My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-11-2016 Council Packet
Orono
>
City Council
>
2016
>
07-11-2016 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2016 10:10:24 AM
Creation date
12/16/2016 9:46:00 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
860
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
#16-3822 <br />July 7, 2016 <br />Page 2 of 3 <br /> <br />County and City on June 20 (Exhibit A). Absent County comment on that plan, the Council did <br />not spend any time reviewing the plat when it approved the CMP amendment on June 27. <br />Hennepin County comments on the June 20 access/turn-lane plan were received on July 5 <br />(Exhibit B) suggesting that while the sight distance does not meet their desirable standard for <br />new development, it does meet their minimum requirements. They indicated that if the second <br />phase multi-family project goes forward, a dedicated westbound left turn lane will be required if <br />not already completed as part of the 2020 turnback construction upgrades for this section of <br />Wayzata Boulevard. <br />Current Review Status <br />The July 5 Hennepin County communication appears to solidify that only the westerly access <br />will be approved, leaving the easterly terminus of the internal private road as either a cul-de-sac <br />or a “T” or hammerhead configuration. Noting that Van Eyll’s preference would be a <br />hammerhead, it was also discussed with Hennepin County as to the possibility of establishing <br />emergency-only accessibility from the T directly to Wayzata Boulevard, which staff would <br />support. This should be included in the preliminary plat requirements for this subdivision. <br />Applicants have not submitted a set of revised overall preliminary plat drawings reflecting the <br />hammerhead and turn lane configurations. These should be required prior to granting <br />preliminary plat approval. Additionally, preliminary plat approval when granted should be <br />contingent on Met Council confirmation of approval of the Comp Plan Amendment, which has <br />not been received as of this writing. <br />Staff is in the process of drafting a Preliminary Plat & General Concept Plan Approval resolution <br />which as of this writing is incomplete and in draft state only, but attached as Exhibit C for <br />Council’s initial review. A list of items for Council discussion or clarification with page <br />references to the Draft Resolution includes: <br />1. The Conservation Design Master Plan is lacking certain detailed information which will be <br />necessary to have fleshed out before final plat approval (Page 4) <br />2. Council to confirm acceptance of “average” FAR of 0.782 – how or whether to define for <br />individual lots; (Please review applicants Supplementary Narrative, Exhibit H) (Page 6) <br />3. Confirm Council acceptance of average hardcover of 35% (some lots will be over 50% <br />RPUD limit) (Page 7) <br />4. Street widths (28’ E-W, 32’ N-S), private vs public, acceptance of T configuration (Page 7) <br />5. Confirm acceptance of no Trail Easement along Wayzata Blvd (Page 8) <br />6. Review Stormwater Fee calculation method (Page 8) <br />7. Discuss any other topics that need to be addressed for preliminary plat approval <br /> <br />Staff Recommendation <br />Based on the County comments indicating a single access point will be allowed, applicants <br />should be providing a revised set of plans showing reflecting the hammerhead configuration, and <br />any other aspects of the preliminary plat that will change as a result. <br /> <br />COUNCIL ACTION REQUESTED <br />Council should review the topics for discussion as noted above, providing staff and applicants <br />with any additional direction necessary to allow for preliminary plat approval. Direct staff to <br />draft a resolution for preliminary plat approval, incorporating appropriate conditions. The
The URL can be used to link to this page
Your browser does not support the video tag.