My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-23-2016 Council Packet
Orono
>
City Council
>
2016
>
05-23-2016 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2016 8:56:05 AM
Creation date
12/16/2016 8:51:59 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REQUEST FOR COUNCIL ACTION <br /> <br />DATE: May 23, 2016 <br /> ITEM NO: 8 <br />_____________________________________________________________________________________ <br />Department Approval: Administrator Reviewed: Agenda Section: <br />Name Adam Edwards JML Public Works Director/ <br />Title Public Works Director/City Engineer City Engineer’s Report <br />____________________________________________________________________________________ <br />Item Description: 2016 Road Maintenance (Hunter and Tamarack) <br />____________________________________________________________________________________ <br /> <br />List of Exhibits <br />A. Project Plan Set <br />B. Bolton & Menk Proposal for Engineering / Inspection Services <br /> <br />1. Purpose. The purpose of this action item is to gain Council authorization for the solicitation of bids <br />for the maintenance project for Hunter and Tamarack Roads. <br /> <br />2. Background At the April 25th Work Session the Council indicated a desire to address maintenance <br />issues on Hunter and Tamarack Roads during the 2016 Construction Season. The 2014 Pavement <br />Management Plan identified Hunter and Tamarack as rated eligible for mill and overlay. Since <br />that time both roads have continued to deteriorate and now requires some additional work to <br />restore the roadways to an acceptable condition. <br /> <br />3. Scope of Work. See Exhibit A <br />a. Tamarack includes reclamation work in the low portion of the road with a new 4” surface. The remainder <br />of the road will be resurfaced with a 2” mill and overlay. <br /> <br />b. Hunter Drive will be resurfaced with a 2” mill and overlay. The most distressed portions of the road will <br />be patched before paving. <br /> <br />4. Cost. The engineers estimate for the project is $126,500. These estimates included costs for <br />Bolton & Menk to assist in creating the plans / specification and project inspection. <br /> <br />5. Funding. The project will be funded from the Pavement Fund. <br />Fund Total CIP Estimate Est. Fund Balance <br />Pavement Fund $ 126,500 $ 156,926 $ <br />Total $ 126,500 <br /> <br />7. Timing. <br />Solicit Bids ..................................................................................................................... May 2016 <br />Open Bids.................................................................................................................... June 7, 2016 <br />Award………………………………………………………………………..……....June 13, 2016 <br />Construction …………………………………………………………………….…..Summer 2016 <br /> <br />COUNCIL ACTION REQUESTED: <br />Consider a motion to authorize the solicitation of bids for the project. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.