My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-23-2016 Council Packet
Orono
>
City Council
>
2016
>
05-23-2016 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2016 8:56:05 AM
Creation date
12/16/2016 8:51:59 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE <br />ORONO CITY COUNCIL MEETING <br />Monday, May 9, 2016 <br />7:00 o’clock p.m. <br />_____________________________________________________________________________________ <br />Page 14 of 28 <br /> <br />10. #16-3822 LAKEWEST DEVELOPMENT, 3245 WAYZATA BOULEVARD WEST – <br />PRELIMINARY PLAT/RPUD REZONING/COMPREHENSIVE PLAN AMENDMENT <br />(continued) <br /> <br />Curt Fretham stated they dug approximately40 test holes on the western edge as well as well as 40 other <br />test holes on the other section and it ranged from 12 to over 20 feet in depth. <br /> <br />McMillan asked if some of that used to be wetland. <br /> <br />Gaffron stated that is correct and that a lot of fill was brought in in the 1980s and 1990s. 1 <br /> <br />McMillan asked if they would be willing to construct turn lanes. <br /> <br />Fretham indicated they would be open to it. <br /> <br />Gaffron asked how the development would be impacted if Hennepin County requests additional right-of- <br />way. <br /> <br />Fretham stated in their view Hennepin County will not request additional right-of-way since there already <br />is 50 feet of right-of-way on that side of the road. <br /> <br />Marty Campion, Engineer, indicated there is 50 feet of right-of-way from the center line to the south and <br />probably 50 to the north, for a total of 100 feet of existing right-of-way. <br /> <br />Campion noted there was a question about access and that they have looked at a single access. Campion <br />indicated they have put together a quick sketch for a single access. Campion stated based on the <br />discussions with the Planning Commission and the possibility of a public street down to Phase II, they <br />chose to place the single access on the west side and provide a T-turnaround on the east side or a cul-de- <br />sac. Campion indicated they both would fit but it would cause the lots to get tight. Campion noted they <br />are not certain that is the place the County was looking at but that they felt it made more sense to have <br />access on the west side. <br /> <br />McMillan asked how wide the paved road would be. <br /> <br />Campion stated they are showing it at 28 feet but that a typical public street width would be 32 feet. <br /> <br />McMillan stated given the amount of housing, it probably would need to be 32 feet. <br /> <br />Gaffron asked if they would still have a 40-foot corridor. <br /> <br />Campion indicated it would be and that the portion of the road to the east would be private. Campion <br />stated if it is a city street, it would be reconfigured slightly in a more north/south direction with a T <br />coming in from the east. Campion stated they were attempting to demonstrate a single access on the west <br />side and that they tried not to impact the overall layout of the plan. <br /> <br />Walsh stated it should be verified that they can build on the landfill site so the City can then guide it for <br />the appropriate density. <br /> <br />Campion stated they do not know for sure what Hennepin County would prefer for the access location.
The URL can be used to link to this page
Your browser does not support the video tag.