Laserfiche WebLink
� . r . <br /> DETERMINING PERMIT FEES <br /> ❑ SAC Charge(2014 Rate=$2,485.00) $ <br /> (SAC Charge must accompany all sewer permit applications unless prepaid) <br /> (Orono City Staff can determine if applicable) <br /> (If not prepaid,a sewer connection permit will not be issued) <br /> S onnection/D' connect/Repair($50.00/Per Stub) $ <br /> ' e s�ze inches;material Schd 40 air tested; cast iron <br /> onne ' ' onnect/Repair($50.00/Per Stub) $ <br /> ' e-gizc--inches;material Schd 40 air tested; copper <br /> ❑Water Availability For Future Hook-tip to Water($50.00) $ <br /> VVater Availabiliri�Explanation: <br /> Contractor installed line to inside of house for future hook-up. <br /> This line will be inspected by the Public Works Department. <br /> Required Before Water Connection Permit is Issued: <br /> 1. Issue Water Meter&Horn Permit <br /> 2. Any Additional Connection Fees Paid(If Applicable) <br /> Issue Water Connection Permit: <br /> 1. Collect Permit Fee&Issue Water Connection Permit <br /> 1. SUBTOTAL of Permit Requested: $ <br /> 2. STATE SURCHARGE $ 5.00 <br /> 3. POSTAGE&HANDLING(Only on Mail-In Applications) $ 2.00 <br /> 4. TOTAL PERMIT FEE(Add Lines 1-3 Above) $ <br /> ADDITIONAL INFORMATION-WATER METERS <br /> ■ WATER METERS must be picked up and paid for at Orono City Hall,these are on a seoarate permit. <br /> ■ WATER METERS must be set and sealed bv Orono Water Department (952) 249-4600, upon <br /> completion of ineter instaliation. <br /> The undersigned hereby applies to the City of Orono for issuance of a Utility Permit, agrees to do <br /> all work in strict accorda e with the ordinances of the City and the regulations of the State of <br /> Minnesota, and ce � at all statements made on this application are, true and correct. <br /> A licant: Date: � � <br /> PP <br />