Laserfiche WebLink
� o� <br /> o , o <br /> - ��3..- , C ITY of ORONO <br /> � � <br /> �'� ���/` ' G'�'� RESOLUTION OF THE CITY COUNCIL <br /> �� 4� rvo. 5 � �. �; <br /> kESYiO <br /> 9) Orono's wetland buffer and buffer setback requirements (Zoning Code <br /> Section 78-1608) shall be met, except as follows: <br /> a) Deminimus fill of 1700 s.f. of wetland in Lot 8 and 300 s.f. of <br /> wetland to accommodate the new road shall be allowed. <br /> b) The 20' wetland buffer setback shall be reduced to 10' for the <br /> ditched wetland along the westerly portion of Lot 10. <br /> E. Grading, Erosion Control <br /> 10) Erosion control shall adhere to "Best Management Practices for Protecting <br /> Water Quality in Urban Areas". All erosion controls as required by the <br /> City and the MCWD shall be in place prior to commencing excavation on <br /> the site. All such erosion control measures shall be maintained in working <br /> order until the site is revegetated. <br /> 11) The construction limits shall be clearly marked with adequate fencing to <br /> prevent any construction damage or disturbance of any trees and <br /> vegetation outside of the construction limits area. Developer shall identify <br /> trees to be preserved on site, shall mark them on a site plan, and shall take <br /> extraordinary measures such as fencing, signage, etc. to ensure they are <br /> not disturbed. <br /> F. Other General Conditions. <br /> 12) A monument sian may be provided by the developer at the entrance to the <br /> RPUD development site within Outlot B. The signa�e shall be limited to a <br /> development name and/or lo�o and on the monument sign. Final <br /> design/materials of monument signage shall be provided as part of the <br /> final development plan submittals and shall be subject to approval by the <br /> City Council. <br /> Pabe 9 of 14 <br />