My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#5420-Gen. concept approval/preliminary plat approval-2006
Orono
>
Property Files
>
Street Address
>
G
>
Glendale Cove Lane
>
2335 Glendale Cove Lane - 34-118-23-33-0066
>
Resolutions
>
#5420-Gen. concept approval/preliminary plat approval-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:57:03 PM
Creation date
12/14/2016 1:19:01 PM
Metadata
Fields
Template:
x Address Old
House Number
2335
Street Name
Glendale Cove
Street Type
Lane
Address
2335 Glendale Cove Lane
Document Type
Resolutions
PIN
3411823330066
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� o� <br /> o � o <br /> �������� CITY of ORONO <br /> a � �' � <br /> ;;..;. <br /> �� "�� G~' RESOLUTION OF THE CITY COUNCI L <br /> „ ,�. <br /> � rvo. 5 � c. �� <br /> `�kEsKog' <br /> 4) An 8' wide bituminous surfaced public pedestrian/bicycle trail shall be <br /> provided by the Developer within Lot 2 connecting from the public road to <br /> Glendale Drive (a portion of which will be in the City of Long Lake and <br /> will require Long Lake's approval). The City of Orono shall be <br /> responsible for maintenance of this public trail upon its completion and <br /> acceptance. Public easements including a suitable shoulder width shall be <br /> granted over said trail. Additionally, Developer shall grant a 10' trail <br /> easement along Willow Drive within Lots and 10 and within Outlots A <br /> and B, for future public trail construction by the City. <br /> C. Utilities; Stormwater Management <br /> 5) Sanitary sewer and municipal water mains shall be installed by the <br /> Developer per plans subject to approval by the City Engineer. <br /> 6) The City will own and maintain the sanitary sewer and water mains within <br /> the development. The City will inspect these systems during their <br /> construction to ensure proper installation. Drainage and Utility Easements <br /> shall be granted to the City of Orono over all sewer and water utility lines <br /> and facilities, includin�the ri�hts of way necessary to maintain same. <br /> 7) Developer shall provide suitable evidence of Minnehaha Creek Watershed <br /> District (MCWD) approval of the stormwater management plan before <br /> Development Plan Approval will be granted. The stormwater drainabe <br /> system will be owned and maintained by a Homeowners Association to be <br /> established by the Developer. <br /> D. Wetland Impacts <br /> 8) Applicant shall demonstrate to the satisfaction of the City Council that all <br /> requirements of the Minnehaha Creek Watershed District as administrator <br /> of the WCA regulations on Orono's behalf, are complied with. <br /> Page8of14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.