Laserfiche WebLink
� o� <br /> 0 0 <br /> '�� CITY of �RONO <br /> � - <br /> � �+�v� .:�� H <br /> � G~' RESOLUTION OF THE CITY COUNCIL <br /> ��kESHO�'� NO. � � �. i: <br /> 13) The applicable general engineerinb comments and or conditions provided <br /> by the City Engineer during the review process shall be suitably addressed <br /> by the Developer in the development plan submittals. <br /> 14) Developer shall provide copies of proposed covenants and documents <br /> describing the structure, rights and responsibilities of the homeowners <br /> association to be reviewed by the City Attorney. <br /> G. Plans and Specifications. The following plans and specifications shall be <br /> submitted for review and approval by the City and other appropriate jurisdictions: <br /> i) Final plans and specifications for all proposed utility lines and services, <br /> including any proposed revisions to existing service facilities. Proposed <br /> plans shall be provided to the City for final review and approval with the <br /> Preliminary Plan set. The Public Works Department and any other <br /> pertinent reviewing agencies shall review and approve all utility <br /> improvements. Final sanitary sewer and watermain plans shall be provided <br /> and are subject to approval by the Public Works Department and City <br /> Engineer, as well as the City of Long Lake. <br /> ii) Final grading, draina�e and erosion control plan showing existing and <br /> proposed contours, building locations, elevations, stormwater facilities and <br /> calculations, utilities and erosion control measures to be used during <br /> construction. Development Plan Approval and final plat approval will not <br /> be granted until the Minnehaha Creek Watershed District and has <br /> approved the stormwater plans. <br /> iii) Final landscaping design plan with planting schedules including numbers <br /> and species, in accordance with the landscaping requirements of the <br /> RPUD zoning district, and the recommendations of Applied Ecological <br /> Services. <br /> iv) Final building construction plans, including <br /> Final Grading & Drainage Plan and SWPP <br /> Final Landscape Plan. <br /> Road and Utilitv Plan <br /> Any additional plans deemed necessary by the Citv Engineer. <br /> Pabe 10 of 14 <br />