My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-P04222 - attached deck
Orono
>
Property Files
>
Street Address
>
G
>
Garden Court
>
1240 Garden Court - 07-117-23-32-0046 (Includes Old Address: 4650 Tonkaview Ln)
>
Permits/inspections
>
2001-P04222 - attached deck
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:35:30 PM
Creation date
12/12/2016 2:34:52 PM
Metadata
Fields
Template:
x Address Old
House Number
1240
Street Name
Garden
Street Type
Court
Address
1240 Garden Ct
Document Type
Permits/inspections
PIN
0711723320046
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> � � <br /> �• O P O S A L Customer Copy <br /> MIGHTY OAK CONSTRUCTION <br /> � I �� <br /> 30114 371ST Ave. � � v', -`' ���� <br /> Henderson, MN. 56044 ��' '�' ��� >,✓� ; <br /> (612) 328-8560 �` � v <br /> , � <br /> � <br /> �,� .�'_-�L;� <br /> � .}- <br /> Proposal Submitted to: Jufy 17, 2001 �� �rV � <br /> Jeff& Lisa Nordstrom Job: Same Address <br /> 4650 Tonkaview Ln. (H) (952) 495-1492 <br /> Orono MN 55364 (W) <br /> We hereby submit specifications and estimates for: <br /> BUILDING OF DECK AND RAILING: <br /> 1. Remove existing siding under the sliding door of home. � . / ��.p- <br /> 1 F/1�- 'L i <br /> 2. Install a 2x10-treated ledger board, lag bolted to the home with a drip metal installed. 11 �_ � ;�� <br /> 3. Prepare and pour footings where specified by city and state code. (Call for a footing inspection) �f - <br /> ��pZ� <br /> 4. Set 6x6 treated posts on the footings secured with pin fastener or other approved fastener. <br /> 5. Install a 2x8-treated double header beam on the top of the 6x6 posts and secured with metal support. <br /> 6. Install 2x10-treated joists 16n on center attached to the ledger board using joist hangers and fasteners, set upon the <br /> double header and secured. <br /> 7. Install 5/4x6 cedar decking to the joists attached with 3"screws. <br /> 8. Install skirt board around the entire three sides of the deck. <br /> 9. Install 4x4 post railings at the corners of the deck secured with carriage bolts, attach 4x4 posts to the house secured <br /> with lag bolts. <br /> 10. Install a railing matching the front railing to meet code with 2x2 attached to the corner posts. <br /> ��k.t t�e�j <br /> 11. Build and attach stairs down north side of deck with a turn On the end o�the corner of deck and ending in front of deck. <br /> Total.... $8,870.00 Owner Initials <br /> SCREEN IN FRONT PORCH: <br /> 1. Frame in opening for screen door at existing opening. <br /> 2. Install black fabri ee ' openings around entire three sides of porch. <br /> 3. Install ce r strips secured 'th screws to hold screening in pl . <br /> 4. Install quare cedar lattice with creen attached to the side, along the e osed bottom two side of porch. <br /> 5. Inst II screen door furnished by homeowner. <br /> Total.... $1,500.00 Owner Initials . <br /> D.,..o 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.