Laserfiche WebLink
SPEC'S Page 4 of4 <br /> [J PAINTING: walls to be sanded smooth and primed and two coats/Flat Latex wall Paint. <br /> Oak Millwork to be stained and varnished- to match existing ACAP. <br /> [J GENERAL NOTES <br /> [] CAUTION: <br /> Do NOT remove, tear down, or dig up anything before building permit is on job site. <br /> [] OWNER to protect or move all personal property from in or around construction area, <br /> both interior and exterior. Please review area before construction start-up and remove <br /> necessary items. <br /> [] OWNER DIRECT "Not Included in Contract" ITEMS: <br /> SAWHORSE to assist in schedule coordination • <br /> • All painting, staining and decoratirig by OWNER.- <br /> • LIGHT FIXTURES . � <br /> • FLOOR FINISHES (tile included) . <br /> • Modifications to public utilities . ' <br /> • ABATEMENTS (lead or asbestos) ' - <br /> • Conections of existing substandard conditions (structural or mechanical) <br /> Owner is responsible for all N.I.C. obligations: <br /> Selections, schedule costs, liabilities and warranty issues. <br /> [J Clean up of building debris at job completion by SAWHORSE. <br /> Dumpster may be left on job site for building�debris. � <br /> (No tires, appliances or neighbor's mattress). _ <br /> [] Any yard damage REPATR including txees, shrubs and all landscaping by OWNER. <br /> Communication is essential for a successful project. <br /> Project Manager: Dan McNosky (ext.24'n <br /> Construction Adminisfrator: Tracy Wright (ext. 241) <br /> Weekend EMERGENCY Pager: 621-527-2590 <br />