Laserfiche WebLink
� ` <br /> _ SAV�HORSE <br /> DESIGNERS & BUILDERS <br /> Maria Anderson Date:9/16/02 <br /> 730 Gander Road Rev: <br /> Orono, MN 55391 <br /> Job# 1631 <br /> [J SCOPE OF PROJECT: Two bathroom renovations. The basement plan includes a new <br /> tub, toilet and vanity w/ ceramic tile floor and bath surround. The master bath on the third <br /> floor includes vanities, a CT shower, new toilet, a whirlpool tub and a new closet. <br /> [] Walls subject to demolition are shaded grey. New walls constructed'are shown as <br /> "crosshatched"on proposed plan. , <br /> BASEMENT BATHROOM . <br /> [] PLUMBING per contract and the following: <br /> All fixtures to be "White", all faucetry to be "Chrome." <br /> Toilet: Manufacturer: TOTO • � � <br /> Model:_ "Drake" � - <br /> Color: COTTON#Ol per C/O <br /> Tu6: Manufacturer: Kohler , , <br /> Model: Mendota ' . <br /> Color: white <br /> Faucet: Price Pfister Parisia - <br /> Lavatory: Manufacturer: Stone Products custom cultured marble � <br /> Color: #715 Jamaican Sand w/double pour bowl per GO <br /> Bowl: #18 white Shape: N <br /> Faucet: Price Pfister Parisia chrome <br /> Other issues of lower level bath; electrical, tile ... etc covered in sections below. <br /> MASTER BATH - <br /> (] WINDOWS- � <br /> 1. Marvin Integrity 3w casements ICA2555 <br /> Rough opening: 6'0 1/2" x 4'7 3/8" <br /> Glass size: approx. 19 13/16" x 50 15/16" <br /> Glazing: . Low"E" insulated, tempered <br /> Exterior finish: clad e�ruded PC "stone white" <br /> Interior finish: Unfinished wood <br /> Jamb size: 6 9/16", due to 2x6 stud walls <br /> Sash to open as per plan, w/"almond" latch, rotos and screen� <br /> No grids, blinds or shades included in this contract - <br /> Trim: Oak or Popular Princeton casing, stained by Sawhorse <br /> [] INTERIOR DOORS- <br /> 2. 2'6" x 6'8" Relocated Door w/existing jamb, casing and hardware. _ <br /> Rough opening: 2'8" x 6'10" <br /> Jamb size: 4 9/16", existing 2x4 stud walls <br /> Trim: Replace casing as needed <br />