Laserfiche WebLink
%��O \\ <br /> � ��, <br /> ,!O O'��������� <br /> . ;�q ; j�� �;;- � CITY of ORONO <br /> .� .. , , <br /> ,\� ��-�y , ,f �%� Municipal Offices <br /> ����,� � � �'�`�',�G�� Street Address: Mailing Address: <br /> i <br /> \��CEggOg'� 2750 Kelley Parkway P.O. Box 66 <br /> �---� Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> � - � � � <br /> Owner: Address:730 Gander Rd. <br /> Permit #'s :5755 Dates :l0/3/79 Contractors :Widmer Bros. <br /> (This is � an existing system [ ] new construction) <br /> SYSTEM COMPLIANCE (1-3) : 3 <br /> 1 Code Svstem: Meets or exceeds current City standards in all respects relating to <br /> design, construction, and location. Appears to be operating properly. <br /> 2 Compliant Svstem: Does not meet all current City standards for new construction, <br /> but in most respects appears to be designed, located, and constructed in accordance <br /> with previous codes and is functioning properly. <br /> � Non-Compliant System: System may or may not meet current City standards for design, <br /> construction, or location, but is failing to properly treat and dispose of the <br /> current input; and any system with less than three feet of vertical separation <br /> between the bottom of the drainfield and the saturated soil level. <br /> (The saturated soil level � has or [ ) has not been identified at this time. If the <br /> saturated soil level has not been identified, this classification is subject to revision. ) <br /> TANK CONDITION 5-9 : 5 <br /> 5� Pumpout not needed at this time <br /> 6 Solids accumulation in tanks indicates they should be pumped out this year. <br /> 7 System is discharging to the surface. Tanks must be pumped out within 48 hours. <br /> 8 Inspection risers missing-tanks could not be inspected. If tanks have not been <br /> pumped out within three years, they should be pumped out and risers installed now. <br /> 9 Inspection pipe is located over tank baffle-can not measure solids accumulation. If <br /> tanks have not been pumped out within three years, they should be pumped out now. <br /> (During the last septic tank Maintenance Pumpout the tanks [ ] were or (� were not <br /> confirmed to be watertight by the licensed pumping contractor. If the tanks were not <br /> confirmed to be watertight, this classification is subject to revision.) <br /> IIBAINFIELD CONDITION (11-14) : 11 <br /> � Drainfield is dry, no surfacing evident. <br /> 12 Some evidence of surfacing, not critical yet. Repair is not required at this time. <br /> 13 Drainfield is saturated and visibly discharging untreated effluent to the surface. <br /> Contact the City Inspector immediately. Repair must be completed within 90 days. <br /> 14 Drainfield extent and condition unknown. <br /> POTENTIAL FOR SYSTEM FAILURE: (system aqe and condition, soils, etc. ) : medium <br /> COMMENTS: The non-compliant septic system must be repaired by 12/31/2006 or within 90 days <br /> of failure (surface discharge) , whichever comes first. <br /> C.� '1C� <br /> Date of Inspection pt c System Inspe tor <br /> Note: In the event that this inspection report is used to satisfy the requirements for a <br /> transfer of property, this report does not guarantee that an existing system will continue <br /> to function properly, but indicates the operation of the system under current conditions. <br /> Telephone (612) 473-7357 • FAX 473-0510 <br />