Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
� o� <br /> o �:�, o <br /> ��`��� CITY of ORONO <br /> ,�:.- � <br /> �, ��1����, --� �ti <br /> � � , _��� Municipal Offices <br /> �f`� �'��```�_'�yG Streat Address: Mailin�Addreu: <br /> �E+gK O g' 2150 Kelley Pa�kway P.O. Box 66 <br /> Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> Owner: M��' �� �����5 p� Address: �3 D G�,�d e�' 12c1 <br /> City Ordinance 199 requires that each existing on-site sewage treatment system in Orono be inspected every two years. <br /> The on-site sewage treatment system at the above address has been inspected and appears to fall into the categories checked below. <br /> SYSTEM CONFORMITY (1-3): � <br /> 1 "CODE SYSTEM" An ISTS which meets all the location,desi�and construction standards ofthe cuirent Orono Municipal Code. <br /> 2 "COMPLIANT SYSTEM" An ISTS which does not meet all the location,desigt and cons4vction standards of the curtant Orono Municipal <br /> �� Code but does meet the three foot sepazation roquirement,and which is not failing or an imminent tlueat to public health or safety. <br /> ( S ) , NON-COMPLIANT SYST'EM" A prohibited ISTS;an ISTS located within a designated 100-year flood plain,any ISTS which may <br /> �/ <br /> " or may not meet all ihe locatioq design,or construction standards ofthe cuirertt Orono Municipal Code and which is failing for any reuon;and <br /> any ISTS with less than three feet of unsaturated soil or sand between the distribution device and the limiting soil characceristics. <br /> T.4NK CONDITION(5-10): S <br /> T:uik inspection indicates: <br /> � Pumpout not needed at this time. <br /> 6 Tank must be pumped out this yeaz (city code requires tanks to be pumped out evecy 3 years. Tank was last pumped �—�—�� ), <br /> 7 Solids accumulalion in tanks is at a critical a critical level. Tanks should be pumped out as soon as possible. <br /> 8 System is discharging to the surface. Tanks must be pumped out withirt 48 hours to eliminate surface discharge. <br /> 9 Inspection risers missing-tanks could not be inspected Inspection risers(4"dia.pipe)must be installed in each tank at next pumpout If tanks <br /> have not bean pumped out within the last three years,they should be pumped out now. <br /> 1� Inspedion pipe is located duecUy over tanlc baffle(does not give accurate measurement of solids accumulation). If tanlcs have not been pumped <br /> out within the last three years,they should be pumped out now. <br /> DRAINFIELD CONDITION 11-14 : �\ <br /> 11 Drainfield is dry,no surfacing evident <br /> 12 Some evidence of surfacing,not criticai yet , <br /> 13 Draintield is saturated and visibly dischazging untreated e$luent to the surface. Contact the City Inspector immediately.Repaics must be <br /> completed within 90 days. <br /> 14 Drainfield extent and condition unknown <br /> CONII�IENTS: S�S�-er.� �.S �a�— Cor.,pl ;q,�� ��c t-o Iac�� �� 3 �-oo� S��er�,fi�a� <br /> bcr.�r�� � a� so �� �.-�r'��,6\� �oRe o� rc�c,�e5 . 6 <br /> �a-31 -ao iD <br /> ���'-°1 `��'l�c� ��+�Pn�,,., <br /> Date of Inspection Septie System Inspector ' <br /> Note: In the everR that Uvs inspection report is used to satisfy the requirements for a moctgage or other transfer of property,be advised that this report does not guazantee <br /> or ceRify that an existing system will continue to function properly,but is merely an opinion of the adequacy of the system under currrnt conditions based on the available <br /> informatioa <br />