My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Septic info
Orono
>
Property Files
>
Street Address
>
G
>
Gander Road
>
730 Gander Road - 04-117-23-43-0021
>
Septic
>
Septic info
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:14:49 PM
Creation date
12/8/2016 2:06:58 PM
Metadata
Fields
Template:
x Address Old
House Number
730
Street Name
Gander
Street Type
Road
Address
730 Gander Rd
Document Type
Septic
PIN
0411723430021
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, -- t <br /> Septic System Upgrade Deadline is Approaching <br /> Here's a friendly reminder to all Orono property owners with non-compliant onsite septic <br /> systems. Be�inning in the mid-1990s the City began to identify those septic systems that <br /> made use of trench drainfields, a majority of which do not maintain the minimum <br /> required vertical separation above seasonal water tables. Each e�istinb system was <br /> subjected to soil borin�s to determine the seasonal water table depth. When a system was <br /> identifi�ed as non-compliant, the owner was notified of the need to bring the system into <br /> compliance and given several years to complete the upgrade. <br /> The deadlines to upgrade were divided into whether or not the property was in the <br /> Shoreland District (within 1000' of a lalce, or within 300' of a protected tributary stream). <br /> Properties in the Shoreland District were given until December 31, 2007 to become <br /> compliant. Properties outside the Shoreland area with non-compliant systems were <br /> allowed until December 31, 2010 to conform to the septic code. <br /> Don't wait until the last minute! The City is strongly recommending that property <br /> owners not wait until the deadline arrives to brinb their systems into compliance. The <br /> process to upgrade your septic system can be quite lengthy. The first step in the process <br /> is to hire a site evaluator & designer to deternline what type of system is required and <br /> provide the blueprint for the system installation. The property owner must then contract <br /> Wi�i1 ?x S�yt1C SySt�17: :::St�11PP t0 �:��J�t�1� S)�gtPm CQI1Stn„�rt�r,j. <br /> The installation of septic systems is very weather dependent, especially for mound <br /> systems, which can only be installed when the �round is relatively dry, i.e. ty�ically June <br /> thru September. Contractors' schedules fill up quickly, so it's important to start your <br /> planning and desian process now to ensure a timely installation. The period of time from <br /> decidin�to update your septic system to the actual installation can easily exceed three to <br /> four months or more. Please contact the Building and Zoninb Department at (952-249- <br /> [1Fj(�f�l �n�it}1 ?ny' it1PSt10pS vOLi 1_'1_2c1y �1c�Ve 1�'tOUt bTlila'ill� y011T SeUt1C SVSte1T1 111t0 <br /> compliance. <br /> F'or a Tist of Iicensed desi;ners and installers you �nay bo to ���m��°ev.��-�a��.�a�a.ua�, <br /> elick on City I)epartments, clic�: on Se�tic, then clicfl: on �he 1in�: to <br /> ww��-.pca.state.inn.us!pro�rams. <br />
The URL can be used to link to this page
Your browser does not support the video tag.