Laserfiche WebLink
, -- t <br /> Septic System Upgrade Deadline is Approaching <br /> Here's a friendly reminder to all Orono property owners with non-compliant onsite septic <br /> systems. Be�inning in the mid-1990s the City began to identify those septic systems that <br /> made use of trench drainfields, a majority of which do not maintain the minimum <br /> required vertical separation above seasonal water tables. Each e�istinb system was <br /> subjected to soil borin�s to determine the seasonal water table depth. When a system was <br /> identifi�ed as non-compliant, the owner was notified of the need to bring the system into <br /> compliance and given several years to complete the upgrade. <br /> The deadlines to upgrade were divided into whether or not the property was in the <br /> Shoreland District (within 1000' of a lalce, or within 300' of a protected tributary stream). <br /> Properties in the Shoreland District were given until December 31, 2007 to become <br /> compliant. Properties outside the Shoreland area with non-compliant systems were <br /> allowed until December 31, 2010 to conform to the septic code. <br /> Don't wait until the last minute! The City is strongly recommending that property <br /> owners not wait until the deadline arrives to brinb their systems into compliance. The <br /> process to upgrade your septic system can be quite lengthy. The first step in the process <br /> is to hire a site evaluator & designer to deternline what type of system is required and <br /> provide the blueprint for the system installation. The property owner must then contract <br /> Wi�i1 ?x S�yt1C SySt�17: :::St�11PP t0 �:��J�t�1� S)�gtPm CQI1Stn„�rt�r,j. <br /> The installation of septic systems is very weather dependent, especially for mound <br /> systems, which can only be installed when the �round is relatively dry, i.e. ty�ically June <br /> thru September. Contractors' schedules fill up quickly, so it's important to start your <br /> planning and desian process now to ensure a timely installation. The period of time from <br /> decidin�to update your septic system to the actual installation can easily exceed three to <br /> four months or more. Please contact the Building and Zoninb Department at (952-249- <br /> [1Fj(�f�l �n�it}1 ?ny' it1PSt10pS vOLi 1_'1_2c1y �1c�Ve 1�'tOUt bTlila'ill� y011T SeUt1C SVSte1T1 111t0 <br /> compliance. <br /> F'or a Tist of Iicensed desi;ners and installers you �nay bo to ���m��°ev.��-�a��.�a�a.ua�, <br /> elick on City I)epartments, clic�: on Se�tic, then clicfl: on �he 1in�: to <br /> ww��-.pca.state.inn.us!pro�rams. <br />