Laserfiche WebLink
MINUTES OF THE <br />ORONO CITY COUNCIL MEETING <br />Monday, October 27, 2014 <br />7:00 o’clock p.m. <br />_____________________________________________________________________________________ <br />  <br />  Page 30 of 32  <br />(12. WATERTOWN ROAD AND STUBBS BAY ROAD REHABILITATION, Continued) <br /> <br />McMillan stated she does not want to spend extra money on something the City is not going to do for the <br />next couple of years and that the engineering work could become outdated. <br /> <br />Printup noted there are only three council members present tonight and that he does not want to hold the <br />project up so he will be voting in favor of the motion. Printup comment it is unfortunate the City is not <br />committing to it since the Council has been discussing this for over a year. <br /> <br />McMillan stated the Council also needs to figure out how to pay for those other two sections and that is a <br />discussion that can be held over the winter. <br /> <br />Levang stated that was also a concern of hers. Levang noted the other two sections will cost over a <br />million dollars and that it is unlikely the City will be able to financially afford to do it in 2015 and that <br />she is not sure whether it will be possible to do in 2016. <br /> <br />McMillan stated she does not want to go forward with engineering work on roads that the City does not <br />have the funds to complete. <br /> <br />VOTE ON THE ABOVE MOTION: Ayes 3, Nays 0. <br /> <br /> <br />*13. NAVARRE STREET LIGHT AND SIDEWALK PROJECT – PAY REQUEST NO. 3 AND <br />CHANGE ORDER NO. 1 <br /> <br />Levang moved, Printup seconded, to approve Change Order No. 1 in the amount of $11,940 and <br />Pay Request No. 3 for the contractor MP Technologies in the amount of $238,935.79 for the <br />Navarre Street Light and Sidewalk Project. VOTE: Ayes 3, Nays 0. <br /> <br /> <br />PUBLIC WORKS DRECTOR/CITY ENGINEER’S REPORT, CONTINUED <br /> <br />Edwards reported cleanout work has been done on a number of culverts as well as repairing washed out <br />culverts around the City. Edwards stated work was done on the Crestview culvert, Stubbs Bay North <br />culvert, and the Watertown Road culvert, which was damaged by Xcel Energy inadvertently putting a <br />pole through it. <br /> <br />Edwards noted the sidewalks and light poles have been installed in Navarre. <br /> <br />Beginning this week, work will start on the sanitary sewer lining and manhole rehabilitation project. A <br />preconstruction meeting was held last week. Edwards noted this project will help address the infiltration <br />problem and that the project will continue in the spring with the manhole rehabilitation. <br /> <br />Levang asked if Xcel will be paying for the culvert on Watertown Road. <br /> <br />Edwards stated he believes so but that those details will need to be worked out. <br /> <br />