Laserfiche WebLink
MINUTES OF THE <br />ORONO CITY COUNCIL MEETING <br />Monday, September 22, 2014 <br />7:00 o’clock p.m. <br />_____________________________________________________________________________________ <br />  <br />  Page 16 of 18  <br /> <br />PUBLIC WORKS DIRECTOR/CITY ENGINEER’S REPORT, CONTINUED <br /> <br />Martini reported work on Rest Point Road is essentially complete and that black dirt has been delivered to <br />the site. Once that is spread, the hydro-seeding will take place. Martini indicated he will continue to <br />follow the restoration work. <br /> <br />Martini stated on Willow Drive south of the fire station, there is a bump in the road over a culvert. A <br />contractor visited the site and a couple of different options were discussed. The contractor stated they <br />would be able to come in with a machine that would heat up the pavement and the area can be reworked <br />over the culvert. Martini indicated that work was completed last week and that the area is somewhat <br />improved from what it was but that it is not quite as smooth as he had hoped. Martini indicated he does <br />have a call in to the contractor to see if it can be smoothed out any further. <br /> <br />Martini reported the Navarre lighting project has been delayed due to a problem with the manufacturer of <br />the light poles. The City is now looking at some time in October to receive the poles. Martini indicated <br />he had a meeting last week with the contractor to discuss the schedule. <br /> <br />McMillan asked why the poles have been so delayed. <br /> <br />Martini indicated there are a limited number of places to obtain the poles from and that he cannot say <br />what the exact problem is outside that the plant broke down and all their projects were delayed. <br /> <br />McMillan suggested Mr. Martini see if the City will be receiving a discount as a result of the delay. <br /> <br />Levang asked if weather is a concern with installing the poles. <br /> <br />Martini stated it is not currently but that they should be installed prior to freezing. <br /> <br />Martini stated one of the issues that arose during the project was that there were a couple of areas of <br />sunken sidewalks. During the work it was discovered that the catch basins underneath the sidewalks were <br />leaking and taking in material. As a result, Hennepin County was notified and asked to make those <br />repairs before all the sidewalk work could be completed. <br /> <br /> <br />MAYOR/COUNCIL REPORT <br /> <br />Levang noted the City newsletter will be coming out the first week of October. <br /> <br />Printup noted Orono’s homecoming was held last week Friday and that he walked with the alumni portion <br />of the parade. Printup commented the kids had a very good time and enjoyed the parade. <br /> <br /> <br /> <br /> <br /> <br /> <br />