My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01513 demo
Orono
>
Property Files
>
Street Address
>
C
>
Cherry Avenue
>
3907 Cherry Avenue - 08-117-23-33-0027
>
Permits/Inspections
>
2016-01513 demo
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:44:44 PM
Creation date
12/8/2016 9:47:21 AM
Metadata
Fields
Template:
x Address Old
House Number
3907
Street Name
Cherry
Street Type
Avenue
Address
3907 Cherry Ave
Document Type
Permits/Inspections
PIN
0811723330027
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. , <br /> 4. Submit a$2,500 escrow and an escrow agreement signed by the property owner(copy attached). <br /> 5. Keep all structure(s) enclosed and/or secured until such time as demolition is complete. <br /> 6. Keep all demolition debris off adjoining property and/or the public rights-of way unless specific prior <br /> approval is obtained in writing for temporary use thereof. <br /> 7. Completely remove foundation(s) from the ground. <br /> 8. Completely dispose of all demolition debris off site in accordance with all applicable PCA requirements. <br /> 9. Abandon water wells in accordance with State Health Department regulations. <br /> 10. Call for an inspection when all debris has been removed, before backfilling. <br /> 11. Within 5 working days of superstructure removal, a final inspection shall be requested. The site shall be left <br /> clean and clear of all debris, with any excavation filled with earth level with the adjacent ground elevation ' <br /> (except when such excavation is to be used as part of a new building and such new building is actually <br /> under construction). <br /> 12. Abandon septic systems per Minnesota Rules Chapter 7080. All septic tanks must be pumped, crushed <br /> and filled with native soils. An inspection is required after the tanks are pumped and before the tanks are <br /> crushed and filled. <br /> 13. The undersigned owner shall and hereby does indemnify and hold harmless the City of Orono, its agents, <br /> employees and assigns from and against all claims, damages, losses or expenses, including attorney fees, <br /> against the City, its agents, employees and assigns arising out of or resulting from the demolition described <br /> herein as performed by the property owner, his employees, agents, subcontractors or assigns. <br /> PERMIT TYPE AND FEE CALCULATION <br /> ❑ $75.00 — Principal Structure $ C- <br /> ❑ $50.00 —Accessory Structure x (how many) <br /> 1. Subtotal of above permit requested $ <br /> �, / <br /> 2. State Surcharge i l,i/� � <br /> (; <br /> 3. TOTAL PERMIT FEE (add lines 1-2 above) $ �;-�� <br /> The undersigned herby applies to the City of Orono for issuance of a Demolition Permit, agrees to do all <br /> the work in a strict accordance wi the ordinances of the City and the regulations of the State of <br /> Minnesota, and certifies that all st me de n t � complete, true and correct. <br /> Applicant's Signature: Date: �C ` 2 _ /� <br /> Owner's Signature: Date: <br /> , i <br /> Approved By: � �"��� �F�' '' Date: !% '�� i c%. <br /> �= � (�uilding icial) ` <br /> * Zoning Disclosure Required? ❑ YES NO <br /> *This must be filled out by Zoning Department—For e� er answer, a Zoning Official must sign all applications. <br /> * Approved By: Date: <br /> (Zoning Official) <br /> Form Last Updated.� July 2015 <br /> 150784 <br />
The URL can be used to link to this page
Your browser does not support the video tag.