My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-24-2014 Council Minutes
Orono
>
City Council
>
Minutes
>
2010-2019
>
2014
>
03-24-2014 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2015 2:11:25 PM
Creation date
3/5/2015 2:10:58 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE <br />ORONO CITY COUNCIL MEETING <br />Monday, March 24, 2014 <br />7:00 o’clock p.m. <br />_____________________________________________________________________________________ <br /> <br /> Page 6 of 24 <br />(5. #13-3638 SOURCE LAND CAPITAL – 405 NORTH ARM DRIVE – LAKEVIEW GOLF <br />COURSE PROPERTY – CONTINUED SKETCH PLAN, Continued) <br /> <br />Pat Hiller noted they were before the City Council on this application on January 6. The feedback <br />received at that time was a desire for a two acre minimum lot size, with some possible flexibility being <br />given on the 200-foot width, minimize the grading impact to the site and work with the natural contours, <br />and to make the connection to North Arm Drive to the north and eliminate the cul-de-sacs. Hiller <br />indicated the cul-de-sacs have been eliminated as much as possible with their revised sketch plan. <br /> <br />Hiller indicated they also have been exploring the possibility of obtaining city water from Minnetrista <br />since the last meeting. <br /> <br />Hiller stated there are four constraints with the site and they are all related to each other. Hiller stated the <br />chart on the overhead is designed to help the Council understand the conservation design constraints, the <br />zoning requirements, the septic locations, and the economics of the site. Hiller stated it is very important <br />to maximize the number of lots in order to help pay for the site restoration and infrastructure associated <br />with obtaining city water from Minnetrista. The more lots mean a lower price per lot, which leads to <br />faster market absorption of the new homes. <br /> <br />Hiller stated due to the nature of the site, there are only certain areas where septic sites will work. The <br />lots must be laid out so that each has 10,000 square feet of area available for a primary and secondary <br />location. The updated sketch plan has reduced the number of lots from 55 down to 52 lots. Based on the <br />net area calculations, 60 lots would be allowed. The lots average 2.2 acres per lot, with direct access to <br />the lots along North Arm Drive. Two major ecological corridors located in the middle of the site will be <br />preserved as well as the natural water pathways. <br /> <br />Hiller noted the current sketch plan meets the two acre zoning requirements in all but the following areas: <br /> <br />1. Six lots will be between 1.7 and 2.0 acres. All other lots are 2.0 or more acres. <br /> <br />2. Seven lots will be between 150 feet and 200 feet in width at the building pad. All other lots will <br /> be 200 feet or more. <br /> <br />3. Depending on final septic site locations, a few lots may require side yard setbacks as low as <br /> 20 feet. All others will be maintained at 30 feet. Hiller noted some of the septic sites will need to <br /> be placed within the Conservation Easements. If that is not allowed, some of the Conservation <br /> Easements will need to be eliminated. <br /> <br />Hiller displayed the proposed current layout of the site. The southerly access off of West Branch will be <br />retained. The overall design does keep the basic concept of the cul-de-sacs. The corridors through the <br />center of the site were important to preserve the natural water pathways. Hiller stated they have <br />rearranged some of the lot lines to ensure that each lot has approximately 10,000 square feet and two <br />septic site pads. Hiller noted the septic sites will need to be confirmed. <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.