My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-10-2014 Council Minutes
Orono
>
City Council
>
2014
>
02-10-2014 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2015 2:10:02 PM
Creation date
3/5/2015 2:09:26 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE <br />ORONO CITY COUNCIL MEETING <br />Monday, February 10, 2014 <br />7:00 o’clock p.m. <br />_____________________________________________________________________________________ <br /> <br /> Page 25 of 30 <br />(11. WATER SYSTEM STUDY/WATER SYSTEM MODELING – PRESENTATION, Continued) <br /> <br />Martini stated in evaluating the components of the systems, they made some recommendations as far as <br />improvements. Martini noted the Navarre system is basically built out with not a lot of growth potential. <br />A new well is recommended for the Highway 12 system since it basically runs 24 hours a day and is taxed <br />out at the high demand times. Martini indicated a new well would increase the capacity of the system and <br />provide that firm capacity and redundancy that is recommended. <br /> <br />From an improvements standpoint, Martini indicated they have identified $278,000 worth of <br />improvements for the Navarre system since those components are getting toward the end of their useful <br />life. In addition, there are some humidity issues in the plant so some dehumidifiers are recommended. <br />Martini indicated for the most part the replacement of the items is due to age issues. As it relates to the <br />Highway 12 system, that is estimated to cost $671,000, with the biggest cost associated with the new well <br />and piping. <br /> <br />Martini stated from a storage standpoint, the Navarre system is pretty well built out at this time and no <br />storage improvements are recommended. On the Highway 12 system, some storage improvements will <br />need to be added at some point in the future due to the potential growth in that area. Martini noted water <br />pressures are reasonably adequate on all systems. The available fire flow generally meets industry <br />standards throughout the system but along Wayzata Boulevard there are some improvements that would <br />be recommended at the time the roadway is improved, including the replacement of an 8-inch pipe with a <br />12-inch pipe as well as some water main extensions. The total estimated cost for the distribution <br />improvements is $694,000. The majority of those costs is related to the expansion and would likely be <br />development driven. <br /> <br />McMillan asked what costs the City would need to incur as part of the turnback of Old Highway 12. <br /> <br />Martini stated to his recollection replacing the 8-inch pipe with the 12-inch pipe was approximately <br />$80,000. <br /> <br />McMillan asked if the extensions are outside of the curb cuts. <br /> <br />Martini indicated they are. <br /> <br />Struve stated some of the extensions are planning for future growth. <br /> <br />McMillan asked if those would be development costs. <br /> <br />Struve indicated that is correct. <br /> <br />Martini stated the combined water systems of Long Lake and Orono are able to meet the maximum day- <br />to-day demands. In an emergency situation, the City does have those interconnects but since they are <br />intended for an emergency situation only, a new well for the Highway 12 system is being recommended. <br />Martini noted if improvements are conducted on the Highway 12 well, fire protection flows will be <br />reduced. <br /> <br />McMillan asked if the City would need to pay for water from Long Lake during that time. <br />
The URL can be used to link to this page
Your browser does not support the video tag.