Laserfiche WebLink
Septic System Upgrade Deadline is Approaching <br /> Here's a fi-iendly reminder to all Orono property owners with non-compliant onsite septic <br /> systems. Be�inning in the mid-1990s the City began to identify those septic systems that <br /> made use of trench drainfields, a majority of which do not maintain the minimum <br /> required vertical separation above seasonal water tables. Each existin� system was <br /> subjected to soil barinbs to determine the seasonal water table depth. When a system was <br /> identified as non-compliant, the owner was notified of the need to bring the system into <br /> compliance and given several years to complete the upgrade. <br /> The deadlines to upgrade were divided into whether or not the property was in the <br /> Shoreland District (within 1000' of a lalce, or within 300' of a protected tributary stream). <br /> Properties in the Shoreland District were given until December 31, 2007 to become <br /> compliant. Properties outside the Shoreland area with non-compliant systems were <br /> allowed until December 31, 2010 to conform to the septic code. <br /> Don't wait until the last minute'. The City is strongly recommending that property <br /> owners not wait until the deadline arrives to bring their systems into compliance. The <br /> process to upgrade your septic system can be quite lengthy. The first step in the process <br /> is to hire a site evaluator & designer to determine what type of system is required and <br /> provide the blueprint for the system installation. The property owner must then contract <br /> v�ith a se�tic sy�stem ir.�ta?ler to ha;�e the system constructed. <br /> The installation of septic systems is very weather dependent, especially for mound <br /> systeins, which can onTy be installed when the bround is relatively �ry, i.e. typically June <br /> thru September. Contractors' schedules fill up quickly, so it's important to start your <br /> planning and design process now to ensure a timely installation. The period of time from <br /> decidin�to update your septic system to the actual installation can easily exceed three to <br /> four months or more. Please contact the Building and Zonin� Department at (9j2-249- <br /> 1500� ���ith ar_y questions yo�_1 ma;�have about brin�in� your septic system into <br /> compliance. <br /> �'or a list of licensed �iesigners and installers you �nay go to w���✓.��.����n�.�ra.aa�, <br /> cYic➢: on C'ity �Jepartments, clic9: on Septie, then e9ic�: on the lin�:to <br /> �,�����.pca.state.mn.us/programs. <br />