My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
septic info
Orono
>
Property Files
>
Street Address
>
F
>
French Lake Road
>
2285 French Lake Road - 10-117-23-22-0011
>
Septic
>
septic info
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:20:58 PM
Creation date
12/6/2016 2:13:49 PM
Metadata
Fields
Template:
x Address Old
House Number
2285
Street Name
French Lake
Street Type
Road
Address
2285 French Lake Road
Document Type
Septic
PIN
1011723220011
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Septic System Upgrade Deadline is Approaching <br /> Here's a fi-iendly reminder to all Orono property owners with non-compliant onsite septic <br /> systems. Be�inning in the mid-1990s the City began to identify those septic systems that <br /> made use of trench drainfields, a majority of which do not maintain the minimum <br /> required vertical separation above seasonal water tables. Each existin� system was <br /> subjected to soil barinbs to determine the seasonal water table depth. When a system was <br /> identified as non-compliant, the owner was notified of the need to bring the system into <br /> compliance and given several years to complete the upgrade. <br /> The deadlines to upgrade were divided into whether or not the property was in the <br /> Shoreland District (within 1000' of a lalce, or within 300' of a protected tributary stream). <br /> Properties in the Shoreland District were given until December 31, 2007 to become <br /> compliant. Properties outside the Shoreland area with non-compliant systems were <br /> allowed until December 31, 2010 to conform to the septic code. <br /> Don't wait until the last minute'. The City is strongly recommending that property <br /> owners not wait until the deadline arrives to bring their systems into compliance. The <br /> process to upgrade your septic system can be quite lengthy. The first step in the process <br /> is to hire a site evaluator & designer to determine what type of system is required and <br /> provide the blueprint for the system installation. The property owner must then contract <br /> v�ith a se�tic sy�stem ir.�ta?ler to ha;�e the system constructed. <br /> The installation of septic systems is very weather dependent, especially for mound <br /> systeins, which can onTy be installed when the bround is relatively �ry, i.e. typically June <br /> thru September. Contractors' schedules fill up quickly, so it's important to start your <br /> planning and design process now to ensure a timely installation. The period of time from <br /> decidin�to update your septic system to the actual installation can easily exceed three to <br /> four months or more. Please contact the Building and Zonin� Department at (9j2-249- <br /> 1500� ���ith ar_y questions yo�_1 ma;�have about brin�in� your septic system into <br /> compliance. <br /> �'or a list of licensed �iesigners and installers you �nay go to w���✓.��.����n�.�ra.aa�, <br /> cYic➢: on C'ity �Jepartments, clic9: on Septie, then e9ic�: on the lin�:to <br /> �,�����.pca.state.mn.us/programs. <br />
The URL can be used to link to this page
Your browser does not support the video tag.