My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-00641 - new mound septic
Orono
>
Property Files
>
Street Address
>
F
>
French Lake Road
>
2250 French Lake Road - 10-117-23-22-0012
>
Septic
>
2009-00641 - new mound septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:20:59 PM
Creation date
12/6/2016 2:05:30 PM
Metadata
Fields
Template:
x Address Old
House Number
2250
Street Name
French Lake
Street Type
Road
Address
2250 French Lake Road
Document Type
Septic
PIN
1011723220012
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G. MOUND SLOPE WIDTH & LENGTH Landslope > 1% slope <br /> (landslope greater than 1%) , µ o e , <br /> 1. Downslope absorpdon width = absorption v��idth (F) , om oo�,e;oGeo° <br /> minus rock layer width (D2) _ 6 ToPso� <br /> �_,� ��Clean Sand��ft <br /> ��• � �` � `v �` - f`/ 1l eparation�_ft �,�� <br /> Resiricting Layer <br /> Upslopewidlh(G2d) Rock W dth(D2) ��'nsJ�pewidN(C2i) <br /> 2. Calculate mound size '" " - --�� � �� E� <br /> UPSLOPE <br /> a. Depth of clean sand fill at upslope edge of qbsorptlon W1dlh-Sand(F� <br /> rock layer = 3 ft minus the distance to restricting ]ayer (C1) �i " <br /> 3 ft - /, � ft = /.`;�� ft <br /> b. Mound height at the upslope edge of rock D-34: SLOPE MUL7'IPLIER TABLE <br /> layer = depth of clean sand for separation (G2a) L�,a vrs�onF DOWNSLOPE <br /> Slo e multipliers for various mulliP liers for various <br /> at upslope edge plus depth of rock layer (1 ft) ��� slope ratios slope ralios <br /> plus depth of cover (1 ft) s:� 4:� s:� b:� �:i a:� s:� a:i s:� b:i �:i <br /> �,"� ft + lft + lft = ?�. � ft 0 3.0 9.0 5.0 6.0 7.0 8.0 3.0 4.0 5.0 6.0 7.0 <br /> c Upslope berm multiplier based on land slope ' z.9� 3.as a.�b 5.66 b.s� �.9� 3.09 9.�� s.zb 6.38 zs3 <br /> 3'�� (see figure D-34) Z 2•g3 3.70 4.54 5.36 6.74 6.90 3.79 4.35 5.56 6.82 814 <br /> d. Upslope width - berm multiplier (G2c) times 3 2'�5 3.57 9.35 5.08 5.79 6.95 3.30 9.54 5.88 7.32 8.86 <br /> 4 2.68 3.95 4.17 4.89 5.46 6.06 3.91 9.76 6.25 7.89 9.72 <br /> upslope mound height (G2b): <br /> tt = �O tt 5 2.61 3.33 9.00 9.62 5.79 5.71 3.53 5.00 6.67 8.57 10.97 <br /> 3. � a. x "3- ' � � <br /> 6 2.54 3.23 3.85 4.4] 9.93 5.41 3.66 5.26 7.14 9.38 12.07 <br /> DOWNSLOPE .-- ,__ <br /> 7 2.48 �.12' 390 9.23 4.70 5.13 3.80 ! 5.56� 7.69 ]0.34 ]3.73 <br /> . ---- __ <br /> e. Drop in e evatiop = rock layer width (D2) times g 2.42 3.03 3.57 4.05 4.99 4.88 3.95 5.88 8.33 11.54 15.9) <br /> percent landslope (C5) = 100 9 2.36 2.99 3.95 3.90 4.30 4.65 4.1] 6.25 9.09 ]3.04 ]8.92 <br /> �� f t X � % = 1�� _ ��1 t ]0 2.31 2.86 3.33 3.75 9.]2 4.49 9.29 6.67 ]0.00 15.00 2333 <br /> f. Downslope mound height = depth of clean 17 2.26 2.78 3.23 3.6] 3.95 4.26 9.48 7.]4 11.71 ]7.65 30.9' <br /> sand for slope diHerence (G2e) at dow�lslope 12 2.21 2.70 3.12 3.49 3.80 4.08 4.69 7.69 12.SD 2l 93 43.75 <br /> rock edge plus the mound height at the <br /> upslope edge of rock layer (G2b) <br /> 3.'�, ft + , ') ft= �i-v ft <br /> g. Downslope berm multiplier based on percent land slop , <br /> S��?� (see figure D-34) " `�" f <br /> . ��� _ <br /> h. Downslope width = downslope multiplier � U�,s,oP��idth(G2d) <br /> (G2g) times do�vnslope mound height (G2� y;; " <br /> '.:.i�:' X �1� �� {t = ���� f t � uPSk,�pe w�au,�csa> Rotk Bed i uPs�o�e�vidth(G2d) <br /> � ft WidUi(D2) �� r /V ft <br /> i. Select the greater of Gl and G2h as the ,��- LengU�(D3) ,o' <br /> downslope width: ����, ft � :\ � Downslope W;du,«2;,�_f, � <br /> j. Total mound width is the sum of upslope \ '>'� Absorption W;dU,cr>_�2 <br /> �� <br /> width (G2d) width plus rock layer width �!��� /_J <br /> (D2) plus downslope width (G2i) \^ Total Length(G2k) {; ��' �, - - <br /> 1�� ft + �� ft + �,��. ft = �-1 � ft <br /> k. Total mound length is the sum of upslope width (�2d) <br /> plus rock layer length (D3) plus upslope width (G2d) <br /> I� ft + ' f� ft + i� ft = �v feet <br /> � �, � .,> ;> q y <br /> Final Dimensions: <br /> , <br /> �>_ x � a �'�,���-. <br /> 1 hereby certify that I have completed this work in accordance with applicable ordinances, rules and laws. <br /> G � � // <br /> ��----- -� (� %.-• � _ • <br /> � - (signature) 3p1 ``-) (license #) 1 ' 1"% '„� (date) <br />
The URL can be used to link to this page
Your browser does not support the video tag.