Laserfiche WebLink
�,il, 29, 20'� '��� ; 3�PM Srla Cominer� lal No, 0337 P. 3 <br /> 1 .. t� � _ . <br /> We pxopose to tear off and re-roof tbe tr�vo flat sectio�as at the above adclress and install a rubber <br /> �oofing systein b�: <br /> . Take off sheet m�tal coping a��d set as'rd.e for retrse. <br /> • Tear off t�ie existing roofing c�own to tJae roof insulatzon, Clean up a��d har.11 away a1� <br /> debris from the premises.l2el�lace an���vet or rotten roof insula�zon at a separ�te price of <br /> $3.20 per sq ft. <br /> • Replace any deteriorated decking(i�any) at a separate price based on labor and naaterials, <br /> above the Co��tract price. Price fox IaE�or and�xzaterials is to be $3.40 per sq. �t� <br /> • Meclav.ucally attA�h one la�er of'/2"wood fiber bo�d roof insulatio�� o�er the entire xoof <br /> surface. <br /> . Install a 60 mil EpDM ftill�r ac3herec(roof system over tbe entire roof sur;face. <br /> • �z�stall reiYiforced termination strip arouncl the entire per'rmeter at all roof to wa11�ocations <br /> securing i�� place 2" pla.tes atad scr��ws 1' on cellter. <br /> • Install proper mem.bray.le primer a�id seanz acihesive at all field se��s in roof syste�n. <br /> . Tnstall pre-molcled pipe boots at a11 pipe locations and secua-e r�rith proper clamp. <br /> • Install proper uncuxed target patches at a11 T seam locations at all the vert'rcallaps aro�nd. <br /> any wa11. <br /> • Install proper lap eaulk at all roof to wall Iocations and target patches. <br /> . Reinstall cap sheet nleta.l. <br /> � Rer�o�re all roof ng eq�u�ment and inaterials from job site when co�npleted and clean up <br /> and haul awa�r aI1 debris fioin the pr�iises. <br /> ��j,�.� � . <br /> � y � r ��. <br /> � � <br /> L-�- � <br /> a <br />