My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-008955 - replace septic sys
Orono
>
Property Files
>
Street Address
>
F
>
French Lake Rd
>
2245 French Lake Rd - 10-117-23-22-0004
>
Septic
>
1997-008955 - replace septic sys
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:20:54 PM
Creation date
12/6/2016 1:42:26 PM
Metadata
Fields
Template:
Address
House Number
2245
Street Name
French Lake
Street Type
Road
Address
2245 French Lake Road
Document Type
Septic
PIN
1011723220004
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. , , <br /> � ' ° <br /> PERCOLAT[ON TEST <br /> ' • AND <br /> MOUND SYSTEM DESIGN <br /> U.S. Marshal Service <br /> 574 U.S.Courthouse <br /> 110 S. 4th Street <br /> Minneapolis, MN 55401 <br /> Att. Kelly Sullivan <br /> SITE: <br /> 2245 French Lake Road <br /> Orono, MN <br /> PREPARED BY: <br /> DON'S BACKHOE AND EXCAVATING, INC <br /> 11585-1 IOTH STREET <br /> COLOGNE,MN 55322 <br /> (612)466-2667 <br /> M.P.C.A. LICENSE #644 <br /> Apri) 25, 1997 <br /> DESIGN REOUIREMENTS <br /> Construct a Mound system based on an estimated water usage of 750 per day. <br /> 750 g.p.d. x .83 sq. ft. g.p.p.d. =630 bed area-minimum design size. <br /> Design size 10 X 63 rock bed with a downslope of 23'-34', sideslopes of 11'-15', upslope of 10'. <br /> Tanks that are required <br /> 2-1250 gallon tanks <br /> 1-1250 gallon pump tank <br /> MateriAls required: note that all mAterials must be confirmed for proper depth on the site <br /> Clean washed sand as specified in MN 7080 386 tons <br /> Clean washed 1 %" aggregate rock 33 tons <br /> Sandy loam for covering mound 36 tons <br /> Loam dirt for the side slopes ]56 tons <br /> PRE-CONSTRUCTION PROCEDURE FOR THIS SITE: <br /> The plumbing in the house must be rerouted to the western outlet by a professional plumber. All others <br /> must be capped. All existing septic tanks must be located, pumped clean, and filled per code. The <br /> designated trees on the draifield site must be removed with as little traffic on the septic site as possible. <br /> Please call the city inspector before the tree removal takes place. <br /> Construction proceedures for the on-site treatment system• <br /> Follow the stricter of the city codes, Minnesota Chapter 7080 for installarion of this system, and design <br /> components for the installation. <br /> MAINTENANCE• Pumping the tanlzs everv 2 years will extend the life of your system� <br />
The URL can be used to link to this page
Your browser does not support the video tag.