Laserfiche WebLink
��r <br /> , �� � 5 � <br /> CITY OF ORONO SEPTIC SYSTEM PEIZNIIT APPLICATION <br /> Box 66 (2750 Kelley Parkway) <br /> Crystal Bay, MN 55323 <br /> JOB STTE ADDRESS:�� ��S /�ie�C h �ti.�� l�U <br /> Occupancy Type: Residential Commercial Other <br /> Permit Type: New or eplacement Syste $100.00 Op%o <br /> Repair E�cisting System, $ 50.00 <br /> 0.50 State surcharge added to above fees <br /> *See fee schedule f�r non-residential permit fees <br /> O�vner's Name: 1/1 S /71Ar�� �.(lS _ YhoneNiuuber: �SiB-/d�a <br /> l��ailing Address: t��i �sc.w,-l�,e�r ��o S. y�`'Sf. CitY� /'ti'►��S �� S.TyO/ <br /> Contractor's Name:�„'s Q,,�/ckD��- E,�cw,�F�fr�J:v� �oneNumber: yGl�"a GG 7 <br /> IVlaili�lg Address: �/t�� //D'-�` � � City: 7ip: .jS.�do? <br /> DO NOT MAIL PAYMENT tiVITH THIS APPLICATION <br /> GENERAL INSTRUCTIONS <br /> 1. Applications for septic system permits may be mailed or submitted in person at the City <br /> Offices; however, permits will not be mailed out. The permit must be picked up in <br /> person at the City Offices and work must not begin unless the permit card is on the job <br /> site. <br /> 2. Permits will be issued only to contractors holding a City of Orono Septic System <br /> Installers License. <br /> 3. All work must be done in accordance with the approved septic system design. Design <br /> reports are not considered approved unless accompanied by the "Ciry of Orono Septic <br /> System Approval" cover sheet signed by the City Inspector. <br /> 4. The following inspections will be required for all septic systems: <br /> A. Pre-installation site inspection to include inspector, installer, and general coutractor. <br /> B. Tank installation prior to covering. <br /> C. Drainf'ield trench installation prior to covering. For mounds, inspection is required <br /> after rough-up but prior to sand placement (sand will be jar tested for silt content), <br /> and again during pressure distribution piping installation in the rock bed. <br /> D. Final inspection to verify proper final cover depths and to verify that all pump station <br /> (where required) components are functional and comply with codes. <br /> 5. Individual holding MPCA Installer Certificate shall be present during inspections. A 24- <br /> hour notice is required for all inspections. � <br />