Laserfiche WebLink
� . <br /> �iv �.�3 3s <br /> CITY OF ORONO S�:PTIC SYSTEM PERMIT APPLICATION <br /> BoY 66 (2750 Kelley Parkway) <br /> Cr��stal Bay, MN 55323 <br /> ,--� / <br /> JOB STTE ADDRESS• . � �`'' , r�%��! k �j-'� �� l�.�c _ <br /> Occupancy Type: Residential �_� Commercial Other <br /> Permit Type: New or Replacement System, $100.00 <br /> Repair Existing System, $ 50.00 � <br /> (Tanks or Drai�field) <br /> 0.50 State surcharge added to above fees <br /> *See fee schedule for non-residential permit fees <br /> � <br /> Owner's Name: �� s � 1•� �� PhoneNumber: <br /> l�iailing Address: ' ?6 G ✓2:�u ,4 � •�lE' ''.� City: "� -'� � 7ip: .�-5>f'/ <br /> Contractor's Name: � l� ,,,� PhoneNum r: Y={�74�-- �y �7 <br /> l�iailing Address: � L ��� (�� ,��`� 6� City: v��-� � 7ap: �'�S'3 s� <br /> DO NOT MAIL PAYMENT WITH THIS APPLICATION <br /> GE�IERAL INSTRUCTIONS <br /> l. Applications for septic system permits may be mailed or submitted in person at the City <br /> Offices; however, permits will not be mailed out. The permit must be picked up in <br /> person at the City Offices and work must not begin unless the permit card is on the job <br /> site. <br /> 2. Permits will be issued only to contractors holding a City of Orono Septic System <br /> Installers License. <br /> 3. All work must be done in accordance with the approved septic system design. Design <br /> reports are not considered approved unless accompanied by the "City of Orono Septic <br /> System Approval" cover sheet signed by the City Inspector. <br /> 4. The following inspections will be required for all septic systems: <br /> A. Pre-installation site inspection to include inspector, installer, and general contractor. <br /> B. Tank installation prior to covering. <br /> C. Drainfield trench installation prior to covering. For mounds, inspection is required <br /> after rough-up but prior to sand placement (sand will be jar tested for silt content), <br /> and again during pressure distribution piping installation in the rock bed. <br /> D. Final inspection to verify proper final cover depths and to verify that all pump station <br /> (where required) components are functional and comply with codes. <br /> 5. Individual holding MPCA Installer Certificate shall be present during inspections. A 24- <br /> hour notice is required for all inspections. <br />