Laserfiche WebLink
, MINUTES OF THE <br /> ORONO CTTY COUNCIL MEETING <br /> Monday,September 9,2013 <br /> 7:00 o'clock p.m. <br /> (7. NAVARRE STREET LIGHTS—DESIGN SERVICE PROPOSALS, Continued) <br /> McMillan asked if the cost information will be available at the October Navarre meeting. <br /> Struve indicated it will not be available in October,but that some preliminary information can be <br /> provided at that meeting. <br /> Printup moved,Anderson seconded,to approve the Navarre Street Light Design Services Proposal <br /> from Bolton and Menk in the amount of$24,650. VOTE: Ayes 5,Nays 0. <br /> *8. PAY REQUEST NO.3—WII�LOW DRIVE RECONSTRUCTON PROJECT <br /> Levang moved,Printup seconded,to approve Pay Request No.3 for the contractor C.S.McCrossan <br /> in the amount of$14,065.22 for the Willow Drive Reconstruction Project. VOTE: Ayes 5,Nays 0. <br /> 9. FLAIL MOWER REPLACEMENT <br /> Levang asked what is going to happen with the old mower. <br /> Struve indicated it will be traded in. <br /> Levang asked if the City is receiving a fair price on that mower. <br /> Struve indicated they are but noted the mower is not in good condition,which is the reason it needs to be <br /> replaced. Struve stated the mower is not used on lawns and is utilized in ditches so it encounters trees, <br /> rocks and random pieces of inetal which necessitates it be replaced. <br /> Levang asked if eight years is what the Public Works Department thought it would last. <br /> Struve stated this will be the ninth year and that the estimate was eight to ten years. <br /> Levang moved,Bremer seconded,to approve the purchase of side and rear mount mowers in the <br /> amount of$16,600.89. VOTE: Ayes 5,Nays 0. <br /> 10. GOLF COURSE VOLUNTEERS—REQUEST FOR ADDITIONAL FUNDS <br /> Struve stated throughout the year the volunteers have removed a substantial amount of buckthorn, <br /> replaced the roof on the maintenance facility, and performed some scraping on the building which led <br /> them to discover additional needs,especially in the storm window department. As part of that process, <br /> the Public Works Department has approved the two roofs on the clubhouse maintenance facility and some <br /> other work. The new concrete entrance will be installed tomorrow. <br /> Struve indicated the volunteer group does have some additional projects they would like to do, including <br /> painting of both facilities, installing a garage door on the maintenance facility, and potentially some <br /> electrical work to get the water fountain pump operable and replacement of the storm windows. The <br /> volunteer group has submitted cost estimates for some of the work and they are requesting use of <br /> contingency funds to complete the work. <br /> Page 5 of 11 <br />