My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-26-2013 Council Minutes
Orono
>
City Council
>
2013
>
08-26-2013 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2015 2:58:23 PM
Creation date
2/23/2015 2:58:22 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE • <br /> ORONO CITY COUNCIL MEETING � <br /> Monday,August 26,2013 <br /> 7:00 o'clock p.m. <br /> PUBLIC WORKS DIRECTOR/CITY ENGINEER'S REPORT <br /> 10. STREET LIGHT UPDATE <br /> Struve noted at the May 13 City Council meeting, Staff presented four options for the Council's review. <br /> One of the inputs was that the Council wanted to gain the input from the residents. A neighborhood <br /> meeting was held on June 10 where the options were presented and surveys were distributed asking for <br /> their input on different attachments, color, etc. On June 13,the City opened an online Monkey survey to <br /> allow for residents to weigh in on the streetlight project. <br /> Struve indicated the results of the survey regarding the color were split between dark brown and black. <br /> Option No. 1 had the most number of votes and a large majority of the survey participants were in favor <br /> of a banner attachment, flag pole holder,electrical outlet,and flower pot holder. <br /> Struve stated Staff is looking for feedback on what the City Council would like to explore as part of this <br /> project. <br /> McMillan asked if October is the next Navarre Community Initiative meeting. <br /> Struve indicated the meeting is scheduled for October 14 and that he can present the decisions made by <br /> the Council at that time. Struve stated they will also be obtaining some proposals from engineering firms <br /> on the costs. <br /> McMillan asked if the City is pursuing grant money for the sidewalks. <br /> Struve indicated they are. <br /> Anderson stated if bids are received,the Council can look at the various line items and determine what <br /> items they would like to go forward with. <br /> Struve stated he is requesting the Council determine what options should be included in the design <br /> parameters and that he will be looking at grants and then inform the Council on what grants have been <br /> applied for. <br /> McMillan commented it may not save a lot of money but that she does not replace the wiring east of <br /> County Road 19. McMillan asked if repairing the sidewalk in spots would also be the place to replace the <br /> wiring. <br /> Struve stated that potentially, may or may not fall in the same location and that the biggest impact will be <br /> around the location of the poles. Struve stated the pits that will be dug may not line up with where the <br /> sidewalks will be replaced. <br /> McMillan commented the businesses may help maintain the flower pot attachments and that they do not <br /> need to do it all the way down the road. McMillan stated she is not sure how those will be watered given <br /> how high up they will be. McMillan requested Struve obtain a metal sample of the two colors prior to the <br /> October meeting. <br /> Page 16 of 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.