My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-12-2013 Council Minutes
Orono
>
City Council
>
2013
>
08-12-2013 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2015 2:58:22 PM
Creation date
2/23/2015 2:58:19 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• MINUTES OF THE <br /> ORONO CITY COUNCIL MEETING <br /> Monday,August 12,2013 <br /> 7:00 dclock p.m. <br /> (11. ORONO PUBLIC SCHOOLS—STOP SIGN REQUEST, Continued) <br /> Struve indicated the Police Department as well as the Public Works Department can monitor it. Struve <br /> indicated the first week of school likely will be pretty telling. <br /> Anderson moved,Printup seconded,to install a stop sign at the north middle school entrance <br /> making it a 4-way stop. VOTE: Ayes 5,Nays 0. <br /> *12. WILLOW DRIVE RECONSTRUCTION PROJECT—PAY REQUEST NO.2 <br /> Anderson moved,Printup seconded,to approve Pay Request No.2 for the contractor C.S. <br /> McCrossan,in the amount of$510,967.29 for the Willow Drive reconstruction project. VOTE: <br /> Ayes 5,Nays 0. <br /> *13. 2013 SANITARY SEWER REHABILITATION PROJECT—PAY REQUEST NO. 1 <br /> Anderson moved,Printup seconded,to approve Pay Request No. 1 for the contractor Visu-Sewer, <br /> in the amount of$52,782.95 for the 2013 sanitary sewer rehabilitation project. VOTE: Ayes 5, <br /> Nays 0. <br /> *14. CARMEN BAY SHORELINE RESTORATION PROJECT—PAY REQUEST NO. 4 <br /> Anderson moved,Printup seconded,to approve Pay Request No.4 for the contractor Sunram <br /> Construction,Inc.,in the amount of$1,760.54 for the Carmen Bay shoreline restoration project. <br /> VOTE: Ayes 5,Nays 0. <br /> 15. 2013 FORCEMAIN IMPROVEMENT PROJECT—BID AWARD <br /> Struve stated at the June 10, 2013, City Council meeting,the Council approved a proposal from Bolton& <br /> Menk for design services associated with the replacement of sanitary sewer forcemains on Tonkawa Road <br /> and Rest Point Drive. The forcemain on Tonkawa is approximately 4,700 feet in total length and the Rest <br /> Point forcemain is approximately 560 feet long. <br /> A small portion of the Tonkawa forcemain was replaced in 2009 but there was another failure in 2011. <br /> The proposed replacement section of the forcemain on Tonkawa has had five failures in the recent years <br /> and is in need of replacement. This project is proposing replacing an additional 1,6001ineal feet of the <br /> forcemain. In addition,the forcemain on Rest Point has had two failures in recent years. During the <br /> repair in the fall of 2012, it was noted the condition of the forcemain has deteriorated to a point of <br /> needing immediate attention or the City risks additional failures. <br /> Bids were opened on August 6 and GL Contracting was the low bidder in the amount of$229,892.10. <br /> This amount is approximately 13 percent below the engineering estimate for the project. Staff <br /> recommends awarding the bid to GL Contracting in the amount of$229,892.10 rather than delay the <br /> project any further. <br /> McMillan asked if this road was identified in the City's CIP. <br /> Struve indicated it was not and was an item that was overlooked. <br /> Page 29 of 37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.