Laserfiche WebLink
All property line will need to be located prfor to instailation. <br /> The existing tanks may be used upon completion of a taok integrity report. The 1st <br /> 1000 gallon lank will be used as a trash trap,the 2n°existing dosing chamber(pump <br /> #1)which wiFl dose 15.6 gallon every 30 minates with a timer to the Multi-Flo Unit. <br /> The effluent wili flow gravity from the Muiti-Flo to the existing 100Q gallon pumping <br /> chamber{pump#2)which wil!pressurized the seepage bed. The power supply& <br /> switches must be located outside tbe manhole&pumping chamber in a weather <br /> proof enclosure. A warning device must be installed with a light&sound device. <br /> This is in case of a pump failure. Recommend to i�stail a 2"d alarm in the dosing <br /> tank due to the ground at the tank is higher the basement slab. if water is left <br /> running in the house,this couid cause a backup over a period of time due to time <br /> dosing. <br /> If the tanks cannot be used,instali a 1800 gailon dual chamber tank reversed,800 <br /> gallon sfde as a trash trap, 1000 gation side as a dosing tank 8 instaii a 1250 gallon <br /> pumping chamber. <br /> Monitoring of Yhe drainfield, UV Lighting &fecal coliform testing is required <br /> immediately after the system is installed. See the monitoring contract for the price. <br /> If the tanks have less than 2'oi cover,the lids, risers&maintenance hole covers <br /> must be insulated to a value of R�O. <br /> Cleanouts for each laterat must be insulated &be accessib[e from finished grade in <br /> an irrigation box w(th a bail valve. <br /> A water meter or event caunter must be installed to monitor daily waEer use. The <br /> homeowner is responsible for the water meter readings. <br /> The mitigation plan is if hydraulic overloading wouid occur,a timer couid be installed <br /> to reduce the amount of efftuent pumped to the system and also by using the 150a <br /> gallon pumping charober altows the effluent to be stored during peak use and <br /> pumped to the system during low water use qeriods. The second would be to install <br /> holding tanks. <br /> i <br /> , <br /> i <br /> i <br />