Laserfiche WebLink
MINUTES OF THE ' <br /> ORONO CITY COUNCIL MEETING <br /> Monday, September 23,2013 <br /> 7:00 o'clock p.m. <br /> (4. #13-3628 THOMAS POTTER ONBEHALF OFRODNEYAND BARBARA BURWELL, <br /> 1100 MILLSTON ROAD, VARIANCES—RESOL UTION TABLED, Contin ued) <br /> Mattick noted the City has an obligation to act on the present application within a certain time frame and <br /> that at this point there is support to approve an oversized structure but not any support for the variance to <br /> the side yard setback. One option is that a new resolution could be drafted approving the current <br /> proposed oversized structure in a conforming location,which would be approved at the first meeting in <br /> October,or the applicant could present a new plan in the next 30 to 45 days and the City Council can <br /> review that. Mattick asked if Mr.Potter knows which way he would like to go at this point. <br /> Potter indicated he will know within a couple of days but that he cannot make a decision at this point <br /> without speaking with the property owner. <br /> Bremer stated it sounds like the application should be tabled. <br /> Levang moved,Bremer seconded,to table Application#13-3628,Thomas Potter on behalf of <br /> Rodney and Barbara Burwell, 1100 Millston Road. VOTE: Ayes 5,Nays 0. <br /> PUBLIC WORKS DIRECTOR/CITY ENGINEER'S REPORT <br /> *5. PUBLIC WORKS RETIREMENT <br /> Levang moved,Printup seconded,to accept the resignation of Dale Skreen from the Public Works <br /> Department effective October 18,2013,and to approve advertising to fill the position of public <br /> works maintenance worker. VOTE: Ayes 5,Nays 0. <br /> 6. WATERTOWN ROAD FEASIBILITY STUDY <br /> Struve stated before the City Council tonight is a request for engineering services to perform a feasibility <br /> report for Watertown Road. Based on preliminary discussions with Long Lake, Staff is exploring a road <br /> project starting in 2015 for the joint section of Watertown Road, east of Willow Road. <br /> Struve noted in the City's approved CIP, a 2015 road project is also called out for the MSA portion of <br /> Watertown Road but that the scope of the project needs to be determined. The feasibility study will look <br /> at existing soil borings conducted in 2006,and a wetland delineation will be performed. The feasibility <br /> report will look at the different aspects of construction and what MSA requirements will be triggered. <br /> Struve stated the feasibility study will specifically explore whether full reconstruction is needed or <br /> whether a mill and overlay or reclamation could occur. <br /> Levang asked if Watertown Road would be done in sections given its length. <br /> Struve stated if a full reconstruction is required,that would have to be phased in over a period of years <br /> since that stretch of road is probably too long to get reconstructed in one year. If a mill and overlay or <br /> reclamation are both viable options,that it could be accomplished in one construction season. <br /> Page 6 of 11 <br />