Laserfiche WebLink
- a,1ir�;, <br /> -� � ��, <br /> r O � �������;, <br /> �I . : �_ �._ �� ��T� o� o���o <br /> ,1, '� 1, ; � ,, - �%;1 Municipal Offices <br /> �;�, `� �� ? ' ,�, '' <br /> �' '� i�`"{ �' � .�� `� G "' Street Address: Mailing Address: <br /> '��t�4 S�c��.�- "'�' 2150 Kelley Parkway P.O. Box 66 <br /> �,.,kEBH� �,.; <br /> ���� Orono, MN 55356 Crystal Bay, MN 55323�0066 <br /> To: The Current Owner of Address �'� �C% ����'�� ��`��� �� ' <br /> City Ordinance requires that onsite sewa�e treatment systems iil0rono be <br /> inspected on a periodic basis. The onsite sewage treatment system at the above <br /> address has been inspected and the following is l:nown about the system. A <br /> sketch of the known components of the system is available for most properties at <br /> the Orono City Hall. <br /> Imminent Public Health Threat <br /> Yes �No <br /> If yes, please contact the Onsite Systems Manager at 952-249-4626 within 10 <br /> days of receipt of this notice. The septic system must be brou?ht into compliance <br /> within 90 days. Failure to do so will result in referral to the City Attorney for <br /> legal action. <br /> System Identified as Non-Compliant <br /> Yes <br /> No <br /> If yes, system must be brought into compliance by: <br /> December 31, 2007 <br /> December 31, 2010 <br /> Other <br /> Septic Tank(s) Pump out Needed <br /> Yes �No <br /> The City recommends the septic tank(s) and/or lift tank be serviced and pumped <br /> out every three years. City records indicate the tank(s) were last pumped out on <br /> �, ��,� -�;'j . The tank(s) should be cleaned throuQh the manhole and <br /> not throuQh the inspection pipes, tlus allows for proper cleaning. <br /> Comments: <br /> �. <br /> �°�� � �� Date of Inspection � '�-��� <br /> Inspector: .. � <br /> �, <br /> Telephone i9�2j 249-�600 • Far (9�?1 249-4616 <br />