My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-17-2016 Planning Commission Packet
Orono
>
Planning Commission
>
2016
>
10-17-2016 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 11:38:52 AM
Creation date
12/1/2016 11:11:07 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
281
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
b. When an existing code system is repaired or expanded, such ISTS shall remain a code <br /> system. Compliant systems, when repaired, shall be upgraded to a code system status <br /> whenever such classification is reasonably attainable. <br /> (4) Construction procedures. <br /> a. Protection of drainfield area. Proposed drainfield areas shall be identified and marked off <br /> on the lot at the time of the site evaluation and prior to any construction or grading <br /> occurring in the area. The drainfield area shall remain undisturbed until drainfield <br /> construction is commenced. No vehicular traffic shall be allowed in the drainfield area <br /> either before or after drainfield installation. <br /> b. Favorable weather required. Drainfield area or trench construction must not proceed if the <br /> area is wet or has had rain within 48 hours. Mound or trench construction shall not proceed <br /> unless the soil moisture content is below the plastic limit. <br /> c. Construction inspection required. The contractor issued a permit for ISTS construction shall <br /> perform all work according to the design specifications approved by the city for each <br /> particular ISTS. All subsurface work, including building sewer, sewage tanks, distribution <br /> system and soil treatment area shall be inspected by the city inspector prior to backfilling <br /> or covering of any portion thereof. It shall be the responsibility of the contractor to notify <br /> the city at least 24 hours prior to the time an inspection will be required,and it shall be the <br /> responsibility of the contractor to ensure that the inspection is accomplished and the <br /> construction is approved prior to any backfilling, covering or continuation of the <br /> construction. <br /> (Code 1984, § 12.30(5); Ord. No. 100 2nd series, §4, 2-10-1992; Ord. No. 147 2nd series, §§ 11-15, 5- <br /> 13-1996; Ord. No. 199 2nd series, § 1(12.30(5)), 5-8-2000; Ord. No. 38 3rd series, § 1, 9-24-2007) <br /> Sec. 78-420. -Area, height, lot width and yard requirements. <br /> (a) Height. No structure or building in the RR-16 district shall exceed 2%stories and shall not exceed 30 <br /> feet in height except as provided in section 78-1366. <br /> (b) Lots. The following minimum requirements shall be observed: <br /> Side Yard <br /> Lot Lot Front Side Rear <br /> Adjacent <br /> Area Width Yard Yard Yard <br /> (acres) (feet) (feet) (feet) to Street (feet) <br /> , (feet) <br /> 2 200 50 30 50 50 <br /> Sec. 78-1434. -Area restrictions. <br /> In all R districts, no accessory building shall exceed 1,000 square feet of footprint area; except that <br /> accessory structures in excess of 1,000 square feet will be allowed under the following conditions: <br /> (1) Not more than one oversized accessory structure (OAS) shall be permitted on any property. An <br /> oversized accessory structure is defined as an accessory structure of footprint area in excess of <br /> 1,000 square feet,except that the following nonroofed accessory structures which exceed 1,000 <br /> Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.