My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-17-2016 Planning Commission Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
2010-2019
>
2016
>
10-17-2016 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 11:38:52 AM
Creation date
12/1/2016 11:11:07 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
281
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� MINUTES OF THE <br /> ORONO PLANNING COMMISSION MEEETING <br /> Monday, September 19,2016 <br /> 6:30 dclock p.m. <br /> 1. The property has been zoned and guided for 2-acre single-family development for many decades. <br /> The current Land Use Plan guiding for Low Density Residential Use by suggesting a density <br /> range of 0.5-2.0 units per acre was established to reflect the various historic densities of <br /> development within the defined Rural Area but was not intended to direct that land historically <br /> zoned for 2-acre lots should be changed to higher densities. <br /> The City specifically guided certain carefully selected properties for higher density in 2010 to <br /> meet Metropolitan Council goals. This was not one of those properties. Therefore, the proposed <br /> development is a significant departure from the historic planned development pattern for this site. <br /> The proposed RPUD element of the proposed subdivision would not appear to be similar in <br /> character to surrounding development. To the immediate west is the Sugar Woods residential <br /> neighborhood, to the immediate south of the property is a single-family residence on a 2.9 acre <br /> lot. Beyond that, in the City of Long Lake are the West Shore Townhomes and the Lake <br /> Community Bank. To the southwest is the Orono Woods Senior Housing residence. <br /> 2. If higher density for a portion of the site is deemed to be acceptable, is the Planning Commission <br /> comfortable with the 15-000-20,000 square foot lot sizes generally proposed in the RPUD portion <br /> of the site? Do these lot sizes provide a reasonable transition between the rura] 2-acre lots to the <br /> north and the variety of development types to the west and south? <br /> 3. Portions of the property located less than 250 feet from the creek or less than 250 feet from the <br /> ordinary high water level of Long Lake are not eligible to be rezoned to RPUD nor are they <br /> subject to flexibility in tertns of lot standards. The applicants are requesting that these areas be <br /> included in the RPUD rezoning in order to allow flexibility due to the physical limitations o the <br /> site. <br /> 4. Due to the number of units to be served, the proposed overall density of development and the use <br /> of municipal sewer and water systems, it could be argued that the road system should be public. <br /> Applicants are prepared for the road to be private. The Planning Commission should discuss the <br /> merits of this being a public or private road. <br /> 5. The Planning Commission should discuss whether this development should be required to create <br /> the RPUD standard 10 percent private recreation area and whether the proposed internal trail <br /> system would satisfy that requirement. <br /> Gaffron noted the topography is very rolling in this area, with some wetlands along the north in the creek <br /> area, a linear wetland centrally located, and along the lakeshore. Gaffron pointed out the location of the <br /> existing house on the overhead. <br /> Gaffron indicated the applicants have a presentation they would like to give to the Planning Commission. <br /> Tom Goodrurn, Westwood Professional Services, stated this project has been three years in the making <br /> and that they have spent a lot of time and effort designing the development. Goodrum noted their team <br /> has worked in the area for a number of years developing properties. <br /> Page 7 of 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.