Laserfiche WebLink
Christine Mattson <br /> From: Christine Mattson <br /> Sent: Wednesday, September 28, 2016 4:19 PM <br /> To: 'tbecker@lighthousemanagement.com' <br /> Cc: 'Greg Prasch' <br /> Subject: 1565 Fairview Cottage Lane/#2016-00899 <br /> Tim, <br /> Our engineer has reviewed the survey for the proposed accessory structure and has the following comments: <br /> 1. The grading plan does not call out the top and bottom elevations of the proposed retaining walls. Please note <br /> if the retaining walls proposed will be greater than 4' in height they must be designed by a licensed professional, <br /> and plans must be submitted to the City for review and approval prior to the construction. Tiered walls are <br /> considered one wall unless they are separated by at least twice the height of the higher wall. The top and <br /> bottom of wall elevations must be shown on the as-built survey. <br /> 2. The plan depicts a silt fence on the side/uphill side of the project site. Perimeter erosion control should be <br /> planned for and installed on the downhill side of the project area. We have hand-drawn on the survey an <br /> approximate silt fence location. Erosion control must be installed and inspected by the City prior to any land <br /> disturbing activities. The contractor must provide a minimum of a 24 hour notice prior to inspection. Erosion <br /> control shall be installed and maintained throughout the entire project and must remain until vegetation has <br /> been established. <br /> 3. Landscape Plan. A landscape plan was not submitted with the application. Any changes to the <br /> exterior/landscaping i.e. patios,grading, sidewalks, retaining walls, etc. not currently shown on the approved <br /> survey will require a separate Zoning Permit application to be submitted and approved prior to the work <br /> commencing. <br /> We can issue the permit since the engineers comments are advisory; however, I noticed the resolution approving the <br /> Conditional Use Permit has not been signed. The resolution requires signatures from both of you. You don't need to <br /> arrive at the same time, but you will need to bring along your driver's license or another form of identification to have <br /> your signatures notarized by City staff. We are open Monday through Friday 8 am to 4:30 pm. Once the resolution is <br /> signed we can issue the building permit. <br /> Please don't hesitate to contact me if you have any questions. <br /> Christine Mattson <br /> Planning Assistant <br /> City of Orono <br /> 2750 Kelley Parkway Orono ; MN j 55356(physical address) <br /> PO Box 66 Crystal Bay I MN 55323-0066 (mailing address) <br /> S 952.249.4620 8 952.249.4616 <br /> 1A cmattson@ci.orono.mn.us I www.ci.orono.mn.us <br /> Office Hours: Monday- Friday 8 am to 4:30 pm <br /> OUR OFFICE WILL BE CLOSED: Friday, November 11, 2016 <br /> Thursday& Friday, November 24& 25, 2016 <br /> 1 <br />