My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-P10580 - septic
Orono
>
Property Files
>
Street Address
>
F
>
French Creek Circle
>
2280 French Creek Circle - 10-117-23-23-0003
>
Septic
>
2006-P10580 - septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:21:08 PM
Creation date
11/30/2016 2:19:36 PM
Metadata
Fields
Template:
x Address Old
House Number
2280
Street Name
French Creek
Street Type
Circle
Address
2280 French Creek Circle
Document Type
Septic
PIN
1011723230003
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, . ' . <br /> Rusty Olson's--Soil and Percolation Testing <br /> Joseph J.Olson—MPCA License#810 � <br /> 11481 RiYerview Rd. PIE,Hanover, M1�1 55341 � <br /> (763)498-8779 <br /> May 14,2006 <br /> William Ulrich <br /> 2280 French Creek Circle • <br /> Orono, Hennepin Counry <br /> This on-site sewage treatment system is designed for a type 1 six bedroom home in accordance with the <br /> Minnesota Pollution Control Agency Chapter 7080 Other standards. <br /> Due to compacted soils.The soil was dug out under the existing system and replaced with course sand when <br /> it was installed.There is an existing 10'x 55' rockbed.The city inspector would like to see a 5'x 55' <br /> addition to the existing rockbed. With the new addition to the existing rockbed the new rockbed would be <br /> 15'x 55"or 750 square feet of rockbed.The top of the existing system must be removed.The loam under <br /> the proposed addition must be removed down to the course sand and replaced with clean course sand to the <br /> elevation of the bottom of the existing rockbed.Add the new rockbed addition as per the design and replace <br /> the soil cover. <br /> All neighboring wells are located greater than 100 feet from proposed treatment area. <br /> Eacisting tanks may be used upon approval of the local inspector. A new 1250 gallon lift starion must be <br /> installed.The old 1000 gallon lift station is to be turned into a sepric tank. <br /> A LUG. Variance maybe needed to install an other system. <br /> The homeowner will be responsible for periodic monitoring of the other septic system. The monitoring set <br /> by LUG. <br /> The mitigation plan for this property is pressurized mound system. <br /> A water meter will need to be installed in the house. <br /> A ptunping chamber will need to be instalfed to lift the ef�luent to the treatment area. The power supply and <br /> switches must be located outside the manhole and pumping chamber in a weatherproof enclosure. A <br /> warning device must be installed with light and sound devices;this is in case of a pump failure. Keep all <br /> heavy equipment off of the proposed treatment areas before and after construction. The area around both <br /> sites should be fenced offbefore construction. This design is not valid and the system will need to be <br /> relocated if failure to protect the areas proposed for on-site sewage treatment occurs. <br /> Nothing other than gray water,((aundry,showers,etc.)human water and toilet tissue would be disposed af <br /> into the septic tanks. <br /> Sinc elv . <br /> / <br /> i <br /> Joseph J. Olson <br />
The URL can be used to link to this page
Your browser does not support the video tag.