Laserfiche WebLink
� <br /> � � , <br /> ��; O <br /> � � C ITY of OI�ONO <br /> � �����,�,�,,=_ <br /> ��° �` '���-� ti Munici al Offices <br /> ,� ��i ,b�.'�ti'�I�r'�!� ,�, P <br /> I��°;��.?,:��;� G <br /> .�9 �,�., ,,,���¢.� Street Address: Mailing Address: <br /> kEBH� 2150 Kelley Parkway P.O. Box 66 <br /> Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> Owner: /�l���v ��')j�P�, Address: 2255 French Creek Cir. <br /> Permit #'s: 781 Dates: 5/5/88 Contractors: Inglesida Engr. <br /> (This is [� an existing system [ ] new construction) . <br /> ., STEM COMPLIANCE (1-3) : 1 <br /> 1 Code System: Meets or exceeds current City standards in all respects relating to design, <br /> construction, and location. Appears to be operating properly. <br /> 2 Compliant System: Does not meet all current City standards for new construction, but in <br /> most respects appears to be designed, located, and constructed in accordance with previous • <br /> codes and is functioning properly. <br /> 3 Non-Compliant System: System may or may not meet current City standards for design, <br /> construction, or location, but is failing to properly treat and dispose of the current <br /> input; and any system with less than three feet of vertical separation between the bottom <br /> of the drainfield and the saturated soil level. <br /> (The saturated soil level [ x] has or ( ] has not been identified at this time. If the <br /> saturated soil level has not`�been identified, this classification is subject to revision.) <br /> K CONDITION (5-9) : 5 <br /> 5 Pumpout not needed at this time. <br /> 6 Solids accumulation in tanks indicates they should be pumped out this year. <br /> 7 System is discharging to the surface. Tanks must be pumped out within 48 hours. <br /> 8 Inspection risers missing-tanks could not be inspected. If tanks have not been pumped out <br /> within three years, they should be pumped out and risers installed now. <br /> 9 Inspection pipe is located over tank baffle-can not measure solids accumulation. If tanks <br /> have not been pumped out within three years, they should be pumped out now. <br /> (During the last septic tank Maintenance Pumpout the tanks [ ] were or [ ] were not confirmed <br /> to be watertight by the licensed pumping contractor. If the tanks were not confirmed to ba <br /> watertight, this classification is subject to revision.) <br /> INFIELD CONDITION (11-14) : 11 <br /> 1 Drainfield is dry, no surfacing evident. <br /> 12 Some evidence of surfacing, not critical yet. Repair is not required at this time. <br /> 13 Drainfield is saturated and visibly discharging untreated effluent to the surface. <br /> Contact the City Inspector immediately. Repair must be completed within 90 days. <br /> 14 Drainfield extent and condition unknown. <br /> POTENTIAL FOR 5YSTEM FAILURE: (system age and condition, soils, etc. ) : low <br /> COMMENTS: <br /> ���i���I � .v <br /> Date of Inspection Sep ic System Inspector <br /> Note: In the event that this inspection report is used to satisfy the requirements for a <br /> transfer of property, this report does not guarantee that an existing system will continue to <br /> function properly, but indicates the operation of the system under current conditions. <br /> Telephone (612) 473-'7357 • FAX 473-0510 <br />