Laserfiche WebLink
��� <br /> ��'�1 \�. <br /> r ��:�, <br /> / � O ',`,` 1� � <br /> +1 , r , , ._ � <br /> ��TY of UR4 <br /> � r�1 t�� � ,�, -- . �, Municipal Offices <br /> �', ",�', �� b'� ' `�I ti <br /> , , ,� , � ;�.� ,�, ih�,\ ,� ('j �% Mailing Address: <br /> Street Address: <br /> `; � � ` ., '�:-' P.O. Bax 66 <br /> ... <q �:; 2150 Kelley Parkway <br /> `::,;kESI30 ii Crystal Bay, MN 55323�0066 <br /> ,�/ Orono, MN 55356 <br /> To: The Current Owner of Address <br /> �a �e �rn�c�� Cfee K C ;�• <br /> City Ordinance requires that onsite sewa�e treatment systems in Orono be <br /> inspected on a periodic basis. The onsite sewa�e treatment system at the above <br /> address has been inspected and the following is known about the system. A <br /> sketch of the known components of the system is available for most properties at <br /> the Orono City Hall. <br /> Imminent Public Health Threat <br /> Yes �No <br /> If yes, please contact the Onsite Systems Manager at 952-249-4626 within 10 <br /> days of receipt of this notice. The septic system must be broujht into compliance <br /> within 90 days. Failure to do so will result in refenal to the City Attomey for <br /> legal action. <br /> System Identified as Non-Compliant <br /> Yes <br /> No � <br /> If yes, system must be brought into compliance by: <br /> December 31, 2007 <br /> December 31, 2010 <br /> Other <br /> Septic Tank(s) Pump out Needed <br /> Yes �No <br /> The City recommends the septic tai�(s) and/or lift tanlc be serviced and pumped <br /> out every three years. City records indicate the tank(s) were last pumped out on <br /> �_� ,�`�_. The tank(s) should be cleaned through the manhole and <br /> riot throu�h the inspection pipes, tlus allows for proper cleanina. <br /> Comments: <br /> Inspecto}� � _�__ ���� Date of Inspection C9 ' � � <br />