Laserfiche WebLink
' �y 1000 �s <br /> � 1� �S� �U����k THtS SYSTEM fS DESIGNED FOR <br /> �� -��/�/� �BEDROOMS. ANY INCREASE IN NUI�BER <br /> ��r7--�� QF BEDR00(�S INVAlIDAtES THIS DESlGN. <br /> 10Xs� ������� Joseph Olson D.B.A. <br /> Rust,y Olson's--Soil and Percolation Testing <br /> .Joseph J. Olson--'�iPCA License#810 <br /> 11-181 Ri�•cr��ie��� Rd. ?�E, Hano�•er, �T:ti 553-11 <br /> (763) �98-8779 Fax(763) -�98-829U <br /> t�pril I I,?016 � j���� ���� <br /> Anthonv Patterson �� <br /> �?�� French Cre�k Circle <br /> Oruno. Hennepin Caunt� <br /> 7 his c�n-site Se��a`�e l rea�ment S�stem is designed for a T�pe 1 four-bedroom home in accordance�ith the <br /> \linnesota Pollution Control Ae�nc� Chapter'08Q and local ordina�ices. <br /> The periodicall} saturated soils were located at 1d-22 inches(mottled soil). Due to the periodically saturated <br /> soils.a pressurired mound s�stem��ith b inches of rock w•ill need to be installed ta treat the septic eff7uent. <br /> 1'he bottom of the treaUnent area must be located at least 3'above the saturated soils.This s��stem is <br /> designed H ith 6 inches of'rock <br /> 7'he e�isting septic s�;tem does not contorm to the stat�code chapter 70RQ <br /> All nei�,hborin�;»ells are greater than 100' from proposed treaunent areas. <br /> �I�he soils at a depth or 1?"have a percolation rate averaging-1.3 MPI. <br /> Che��isting tanks ma} br used upon appro�al af the local inspector.A DarH in precast 1500 gallon split <br /> tank�QO�1000 needs to b�installed. L'se the 1000�_allan side far the neH�lift station. The �00 gallon side is <br /> used a�a septic tank to meet the 22i0 gallon septic capacit��code_If ne���tanks need to be installed A 1250 <br /> and 10�0�allon septic tanks need tn be installed. <br /> All ne�r tanks need to be insulated if th�re is less than n��o feet o1 co��er over the top of the tanks. Clean outs <br /> must be installed on the znd of the laterals for maintenance. <br /> .A 1000 gallon pu�uping chamber��ill need t�be installed to lift the effluent to the treaunent area.The po��er <br /> �uppl� and s��itches must be located outside the manhole and pumpin�chamber in a»eatherproot'enclosure. <br /> .A��arning devic�must be installed �+ith li�ht and sound devices;this is in case of a pump failure. A flo�� <br /> measureinent de�ic�must be installed.Includin�but not limited to a�rater meter,event counter,running time <br /> clocks or electronicalh�controlled dosin�. <br /> Nothin�other than ara� �ater,(laundr�,show�ers,etc.)Human�ater and toilet tissue�hould be <br /> disoo�ed of into the septic tanks.Carbaee disnosals are not recommended. Additives must not be <br /> used;the� mav cause harmful damaQe to�our se�tic s��stem.lt is recommended that��au nump the <br /> tank e��er� tHo�ears for t�+a seotic tanks. <br /> �'��`"�`�`. CITY OF ORONO <br /> ,%��' SEPTIC P MIT P—L��1 EVIEW <br /> �,r..,� .,,.------�—_...�_ INSPECT R ' <br /> :`_ DIA�TE `7 Z PERMITNO.���� <br /> Joseph J. Olson ir�- AP ROVl:D AS SCI3MITTED <br /> � � APPROVF•.D WITH CORRFCTIOtiS AS�'OTF.D <br /> KOTAPPROVF.I)•CORKf.CT& REStiF3�1(T <br /> Thcsc commcnts urc Ibr your inlimnation. All work shall hc done <br /> in full compliancc with ull upplic�:b(e scptic and zonini,cudc. <br /> Rcquiremcnts including itcros nut,��ccillc.�ily nuicd in this rcvicw. <br /> KEEP THIS PLAN SFT ON SfI G A"f�A�i,"Ti11I�.S <br />