My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-00720 - septic
Orono
>
Property Files
>
Street Address
>
F
>
French Creek Circle
>
2235 French Creek Circle - 10-117-23-32-0005
>
Septic
>
2016-00720 - septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:25:22 PM
Creation date
11/30/2016 1:14:07 PM
Metadata
Fields
Template:
x Address Old
House Number
2235
Street Name
French Creek
Street Type
Circle
Address
2235 French Creek Circle
Document Type
Septic
PIN
1011723320005
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. DISTRIBUTION ME4lA: REGISTEREQ 7REATMENT PRODUCTS: CHAMBERS AND EZFLOW <br /> A. Enter Dispersat Media: <br /> B. Enter the Component: Length: �ft Width:�ft Depth:�ft <br /> C. Number of Components per Row=Bed Length divided by Component Length (Round up} <br /> � ft ' � f t = �components/row <br /> D. Actuat Bed Length = Number of Components/row X Component Length: <br /> �components X ��ft = C�ft <br /> E. Number of Rows= Bed Width divided by tompanent Width (Round up1 <br /> � ft = C� ft = �� rows AdjusC width so this is an who(e number. <br /> F. Total Number of Components = Number of Components per Row X Number of Rows <br /> � X [� - Qcomponents <br /> 6. MOUNO SIZING <br /> A. Calculate Minimum Clean Sand Lift: 3 feet minus Depth to Limiting Condition =Ctean Sand Lift <br /> 3.0 ft - 1.2 ft = 1.8 ft Design Sand Lift (optional►: C�f[ <br /> 8. Calculate Upslope HeighG Clean Sand Lift � media depth + cover (1 ft.) = Upstope Height <br /> t.8 ft t 0.5 ft + 1.0 ft = 3.3 ft <br /> C. Select Upslope Berm Multiplier (based on tand slope): 2.94 <br /> land Slope°10 0 1 2 3 4 5 6 7 8 9 10 11 12 <br /> Upslope Berm 3:1 3.00 2.91 2.83 2.75 2.68 2.61 2.54 2.48 2.�2 2.36 2.31 2.26 2.21 <br /> Raiio 4:1 4.00 3.85 3.70 3.57 3.45 3.33 3.23 3.12 3.03 2.94 2.86 2.78 2.70 <br /> D. Calculate Upslope Berm Width: Multiptier X Upslope Mound Height = Upstope Berm Width <br /> 2.94 ft X 3.3 ft = 10.0 ft <br /> E. Cakutate Drop in Elevation Under Bed: Bed Width X Land Slope = 100 = Drop (ft) <br /> 10.0 ft X 9.0 � : 100= 0.90 ft <br /> F. Catcutate Downslope Mound Height: Upslope Height + Orop in Elevatian = Oownslope Height <br /> 3.3 ft + 0.90 ft = 4.2 ft <br /> G. Select Downslope Berm Muttiptier (based on land slope): 5.18 <br /> Land Siope�0 0 1 2 3 4 5 6 7 8 9 10 11 12 <br /> Downsiope 3�1 3.00 3.09 3.19 3.30 3.41 3.53 3.66 3.80 3.95 4.11 4.29 4.48 4.69 <br /> Berm Ratio 4:I A.00 A.17 4.35 4.54 4.76 5.00 5.26 5.56 5.88 6.25 6.67 7.14 7.69 <br /> H. Caltulate Downslope Berm Width: Multiplier X Downstope Height = Downslope Berm Width <br /> 5.18 x 4.2 ft = 21.9 ft <br /> f. Calculate Minimum Berm to Cover Absorption Area: Downslope Absorption Width +4 feet <br /> 16.0 ft +�ft = 20.0 ft <br /> J. Desi�n Oownstope Berm =greater of 4H and 41: 22.0 ft <br /> K. SetecL Endstope 6erm Multiplier: 3.�0 (usualty 3.0 or 4.0) <br /> C. Calculate Endslope Berm X Downstope Mound Height = Endstope Berm Width <br /> 3.00 ft X 4.2 ft = 13.0 ft <br /> M. Caltulate Mound Width: Upslope Berm Width + ged Width + Downslope Berm Width <br /> 10.0 ft + 10.0 ft � 2z.0 ft = 42.0 ft <br /> N. Calcutate Mound Length: Endslope Berm Width + Bed Length + Endstope Berm Width <br /> 13.0 ft + 50.0 ft + 13.0 ft = 76.0 ft <br />
The URL can be used to link to this page
Your browser does not support the video tag.