My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-20-2013 Planning Commission Packet
Orono
>
Planning Commission
>
2013
>
05-20-2013 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2013 12:59:26 PM
Creation date
5/22/2013 12:54:16 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� i <br /> � approval is granted by the community. If the construction or development <br /> � is already completed, then the planning director may either: (1) issue an <br /> order identifying the corrective actions that must be made within a <br /> specified time period to bring the use or structure into compliance with the <br /> official controls; or (2) notify the responsible parry to apply for an after- <br /> the-fact permit/development approval within a specified period of time not <br /> to exceed 30-days. � � <br /> (4) If the responsible party does not appropriately respond to the planning <br /> director within the specified period of time, each additional day that lapses <br /> shall constitute an additional violation of this article and shall be <br /> prosecuted accordingly. The planning director shall also upon the lapse of <br /> the specified response period notify the landowner to restore the land to <br /> the condition which existed prior to the violation of this article. <br /> (Ord. No. 28 3rd series, �1, 8-22-2005) � <br /> Secs. 78-1615-78-1630. -Reserved. ' <br /> Page 16 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.