Subject: Procedure for scheduling inspections and when inspections should be made. . <br /> 'I'o: Contractor or Homeowner <br /> From: Lyle Oman, Building Official Website: www.ci.orono.mn.us <br /> All inspections will be made within 24-48 hours, upon notification by telephone or in person <br /> (952-249-4600). <br /> 1. Footina Inspection- To be made after the forms are in place and prior to the pouring of any <br /> concrete. All survey stakes must be marked. <br /> 2. Poured Wal]Inspection-To be made after the forms are in place and prior to the pouring of any <br /> concrete. <br /> 3. Plumbina Inspection - After all plumbinQ is roughed in, 5# air test is required. <br /> 4. Septic Svstem - See septic system installers'handout. <br /> 5. Sewer/Water Connections-To be made prior to covering anyportion of connection.(Schedule <br /> 40 pipe and 5# air test is required on sewer piping) <br /> , 6. Mechanical Ins ection - After heating is roughed in. (Gas line air test required) <br /> 7. Electrical Inspection-After all electrical is roughed in. Inspection and permits done by State <br /> Electrical Inspector, David Huckey, 952-442-19�5 (office hours 7:00-8:30 a.m.). <br /> 8. Framin Q Inspection-To be made after inspection no. 3,6,and 7 are complete,but prior to the <br /> placement of any coverin�material. <br /> 9. Insulation Inspection-To be made after the roof coverin�is completed,insulation and vapor <br /> barrier are in place, but prior to the placement of any covering material. <br /> 10. Stucco Lath - To be made after lathing is in place, but before any plastering is applied. <br /> 1 l. Mechanical Final - When Mechanical Systems are complete. <br /> 12. PlumbinQ Final - When Plumbing is complete. <br /> 13. Final Inspection- to be made after the building is complete and prior to occupancy. <br /> V:\(Hand Outs-Information)�Inspection Instructionl.wpd Updated:May I5,2007 <br />