Laserfiche WebLink
Ay � . . <br /> MINNEHAHA CREEK WATERSHED DISTRICT <br /> QUALITY OF WATER ""`rr- QUALITY OF LIFE <br /> March 29,2012 <br /> Perry Schmidt <br /> 370 Bergamot Drive <br /> The Minnehaha Creek Medina,MN 55340 <br /> VYatershed Distrrct is Re: After-the-Fact Permit Application#12-069; 517 Ferndale Road North,Orono <br /> committed to a Dear Mr. Schmidt: <br /> leadership role in <br /> Your application for a Minnehaha Creek Watershed District(MCWD)permit was received on <br /> protectrng, improv;ng March 9, 2012.The permit application is currently incomplete.The MCWD would like to <br /> and managing the remind the applicant that construction is not to begin on a site until a permit has been issued. <br /> surjnce waters and Please submit the following information: <br /> affrliated groundwater <br /> Erosion Control: <br /> resaurces wrthin the • Erosion control plan including the following: <br /> District, inctuding their ❑ Location of existing,pre-existing or proposed buildings or structures on- <br /> refationshrps to the site(include footprint of pre-existing structure in square feet) <br /> o Due to the presence of wetland(s) on the property,if a new <br /> ecosystems of v�hich they principal residential structure is constructed that increases the hard <br /> are an integral part cover on the property a wetland buffer is required adjacent to each <br /> wetland <br /> We Qchieve our mission ❑ Existing and proposed elevation contours <br /> rhr�ugh regulation, ❑ Existing 100 year flood elevation <br /> ❑ Wetland boundaries <br /> capita!projects, o Submit a wetland delineation report for boundary and type <br /> approval under the Wetland Conservation Act(WCA)by 4:30 PM <br /> education, coaperative on June 30`",2012 as requested in the letter sent to you on <br /> endeavors, and other February 27�',2012. <br /> ❑ Silt fence along all roads and trails <br /> programs based on ❑ Silt fence at the bottom of all slopes leading off site or toward water <br /> sound srience, resources <br /> ❑ Silt fence and/or cover around/on all large stockpiles <br /> innovative thinkr'ng, an � ❑ Crushed rock or existing paved construction access <br /> irrformed and engaged ❑ Location of all trees and vegetation on site,identification of those to be <br /> retained,and method of protection <br /> constituency, and the ❑ Documentation of all applicable counTy,municipal,or township approvals <br /> for the proposed action or a statement that no such approvals are required <br /> cost effective ase of ❑ Site and erosion control plan must be I 1"x17"in size or smaller <br /> pubtic funds. <br /> As we review your submittals,we may find the need to request additional information, and will <br /> so inform you.All of the above information needs to be submitted no later than 10 business <br /> days following wetland boundary and type approval. <br /> . On March 27�',2012 an on-site inspection was conducted and it was noted that the fill on site <br /> has not been removed by the March 9'j`,2012 deadline.To avoid formal enforcement action and <br />