My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-15-2012 Planning Commission Packet
Orono
>
Planning Commission
>
2012
>
10-15-2012 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2013 3:51:32 PM
Creation date
4/1/2013 3:51:14 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PC Exhibit G <br /> • � BOLTON 8�. M �N K , I NC� <br /> - � Consulting Engineers & Surveyors <br /> '� 2638 Shadow Lane, Suite 200•Chaska, MN 55318-1172 <br /> Phone(952)448-8838•Fax(952)448-8805 . <br /> www.bolton-menk.com <br /> October 3,2012 � <br /> �"City of Orono ` � � <br /> Attn:Melanie Curtis . <br /> PO Box 66 <br /> Orono,Mn 55323 • <br /> RE: Pernut Application 2012-3578 <br /> Garage Construction <br /> 25 Stubbs Bay Road North <br /> Dear Melanie: <br /> As requested,we have reviewed the submittal package for the proposed garage construction at 25 Stubbs <br /> Bay Road Nort�..fThe submittal package includes the following documents: a.�.,.,. <br /> V1N�?. k'�k�. <br /> 1. Certi�cate of Survey prepazed by Gronberg&Associates,dated September 16,2012 <br /> 2. Elevations and foundation plan sketches, dated August 17,2012 <br /> Based on our review,we offer the following comments for your consideration: <br /> 1. The applicant is proposing to construct an addition to the west side of the e�cisting garage, <br /> matching the existing roof line and maintaining existing drainage patterns. <br /> 2. This project will disturb less than 25 cubic yards of material. Therefore, a Storm Water Pollution <br /> Prevention Plan(SWPPP)is not required. <br /> 3. The area proposed for the garage addition is currently hard-packed earth and is used for outdoor <br /> pazking. Therefore,the affect on peak runoff rates will be insignificant. <br /> 4. A steep slope exists directly west of the proposed gazage addition. Care should be exercised <br /> during co�struction to protect this slope and prevent erosion. . � <br /> Please contact me if you have any questions or need additional information. <br /> Sincerely, <br /> BOLTON&MENK,INC. <br /> �.6�� `��� <br /> ,. <br /> Robert E.Bean,Jr.,P.E. <br /> Water Resources Engineer <br /> . .o.�s� <br /> . ,F, _ .. <br />
The URL can be used to link to this page
Your browser does not support the video tag.