My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-15-2012 Planning Commission Packet
Orono
>
Planning Commission
>
2012
>
10-15-2012 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2013 3:51:32 PM
Creation date
4/1/2013 3:51:14 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PC Exhibit J <br /> 2700 Sixth Avenue North <br /> Summarv Estimate of Fees* <br /> Preliminary Subdivision Plat Application: <br /> Preliminary Subdivision Application $850+$30/lot <br /> � Proposed Private Road $650+$0.50/lineal foot <br /> . Proposed On-Site Evaluation—review charges $60 per proposed lot <br /> _ <br /> Application Escrow{guarantees payment of City's consultant costs) $10,000 <br /> Estimated cost of City Engineer's review of preliminary plat $7,500 <br /> (Actual cost will be billed to property owner) <br /> Collected with Application � $1,380.00+$10,000 escrow <br /> , ($650.00 for road still owed) <br /> Final Subdivision Plat Application: <br /> Final Subdivision Application, including Legal Review and Filing <br /> (w/covenants) (Covers first review of documents, if additi'onal time is � <br /> required,those costs will be billed to the property owner.) $700 <br /> Storm Water and Drainage Trunk Fee $3,360/acre ** <br /> � (paid for the entire plat) � <br /> * Park Fee (8%of Fair Market Value), but no less than <br /> $3,250/per lot and no more than$5,550 per lot x#of new(ots $5,550/lot <br /> Estimated cost of City Engineer's review of final plat $500.00 <br /> (Actual cost will be billed to property owner) <br /> Final Subdivision Application Fee is paid with the Final Plat application. Storm Water and Drainage Trunk Fee, <br /> Park Fee and consultant costs are paid before the final plat is recorded. A <br /> *Based on 2012 Fee Schedule <br /> ** Maximum Fee: For the 2-acre zoning districts, any lot exceeding 4.0 gross acres including wet <br /> land,shall be charged a maximum trunk fee equal to the trunk fee for a 4.0 acre parcel. <br />
The URL can be used to link to this page
Your browser does not support the video tag.