My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-19-2013 Planning Commission Packet
Orono
>
Planning Commission
>
2013
>
02-19-2013 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2013 3:31:01 PM
Creation date
4/1/2013 3:30:18 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
400
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Sec. 78-1431. -Accessory buildings and structures on through lo�,s. <br /> All accessory buildings and structures on through lots located in R districts shall meet the <br /> #ollowing requirements: ' <br /> (1) The building or structure shall meet the principal building setbacks that are <br /> established under sections 78-230, 78-255, 78-305, 78-330, 78-350, 78-370, <br /> 78-395,78-420, 78-444 <br /> (2) No negative impacts to adjacent neighbors or public right-of-way result in the <br /> placement of the building or structure, determined at the discretion of the <br /> planning director. <br /> Should the planning director determine that item (2) above cannot be met an <br /> accessory structure or building may be permitted by conditional use permit if the <br /> planning commission determines no negative impacts result in the placement of the <br /> building or structure.The pfanning commission may apply reasonable conditions as <br /> part of the approvaL <br /> (Code 1984, §10.03(10);Orcl. No. 15 3rcJ series,§ 1, 6-28-2004) <br /> Sec. 78-1432. -Time of construction. <br /> No accessory building or structure shall be constructed on any lot prior to the time of <br /> construction of the principal building to which it is accessory.At the time of demolition of the <br /> principal building, all nonconforming accessory structures must be removed.Accessory <br /> structures, which comply with this title, are allowed to remain contingent on a signed <br /> agreement stating the following: <br /> (1) Applicants agree to obtain a building permit for construction of the <br /> replacement residence within 60 days of demolition; to begin construction on <br /> the new residence within 120 days of demolition; and to complete all exterior <br /> work within one year of building permit issuance and interior work within two <br /> years of building permit issuance. <br /> (2) In the event that any activity described in item (1) has not been accomplished � <br /> � within the defined timeframe,the applicants shall remove the accessory <br /> structures at the applicants' expense, or the applicants shall apply for an <br /> extension of this agreement. <br /> � (3) If one of the item (1) events occurs and the app(icants fail to perform their <br /> removal obligations per item(2),the applicants hereby agree as follows: <br /> � a. The city may enter upon the properly and remove the accessory <br /> building(s). � ' <br /> b. The city may assess the costs of removal to the properiy. <br /> (4) The agreement shall be binding upon current and future owners of the <br /> properly, and shall be filed within the chain of title of the property. <br /> Page 10 of 19. <br />
The URL can be used to link to this page
Your browser does not support the video tag.